certificate as provided in Section 9 . 5 . 1 of A20111i 1997 . A201 TM- 1997 , as modified. The time periods stated in this
<br /> Section 7 . 2 supersede those stated in Section 9 .4. 1 of rA 20IT'"'�rA201TM- 1997 , as modified .
<br /> § 7.2.4 If the Owner' s aeeountant^ ~epeft Owner disputes the Cost of the-Work as substantiated by the Construction
<br /> Manager ' s -Manager' s final aeoetiating to be less than elaimed by accountin;;, the renst~. , ,.tion >, ,r ,, nager- the
<br /> construction Manager shall be entitled to preeeed -assert a claim in accordance with Article 9 • ithout a
<br /> f , ~the~ deersion n of the fyhiteet Unless a eed to otherwise , ,, demand Far- mediationef-afbitfatien-A20ITM- 1997 ,
<br /> as modified . The Owner shall , pending resolution of the disputed afneulot
<br /> shall 1 to by ., e r
<br /> disputed Y shall VY made
<br /> Manager- within 60 days aftef the Construetion Manager ' s receipt of a eapy of the Arehiteet' s final Gef:tifieate fe
<br /> Payment. Failure to make any such demand within this 60 day pe ~: ed shall _ _ salt in the substantiated amount
<br /> reparted by the Ownef' s aeeountants bece"ag binding on the Constfuetion Manager-. Pending a final resolution e
<br /> the disputed amount, the OwneY she " dispute, pay the Construction Manager the ame I., n * eerf.f ed all sums otherwise
<br /> payable and not in the rL-Vhi1Yet ' ~ final Ce~tifie . te Fe~ P , y ent dpute
<br /> § 7.2 , 5 If, subsequent to final payment and at the Owner' s request, the Construction Manager incurs costs described
<br /> in Section 6. 1 and not excluded by Section 6 . 2 ( 1 ) to correct nonconforming Work or (2) arising from the resolution
<br /> of disputes, the Owner shall reimburse the Construction Manager such costs and the Construction Manager ' s Fee, if
<br /> any, related thereto on the same basis as if such costs had been incurred prior to final payment, but not in excess of
<br /> the Guaranteed Maximum Price . If the Construction Manager has participated in savings, the amount of such
<br /> savings shall be recalculated and appropriate credit given to the Owner in determining the net amount to be paid by
<br /> the Owner to the Construction Manager.
<br /> ARTICLE 8 INSURANCE AND BONDS
<br /> § 8 . 1 INSURANCE REQUIRED OF THE CONSTRUCTION MANAGER
<br /> During both phases of the Project, the Construction Manager shall purchase and maintain insurance as set forth in
<br /> Section 11 . 1 of A201TM—�TA201TM- 1997 , as modified. Such insurance shall be written for not less than the
<br /> following li"� z limits as required by law-. Section 11 . 1 . 1 of A201TM- 1997 , as modified.
<br /> § 8. 1 . 1 Wafker-s ' Compensation and Efnpleyef:s ' Liability fneeting statutefy li"ts mandated by state and federal
<br /> laws . if ( 1 ) limits in excess of thoseFequifed by statute are to be provided, of (2) the empleyef is not statutefily
<br /> bound to obtain stieh insufanee eover-age or- (3 ) additional eoverages are fequir-ed , additional cover-ages and limits fe
<br /> § 8 . 1 .2
<br /> Damage (inel „ ding eb Explesion,a Fe.• lesiUndergroundCollapse and Underground h d ) ,
<br /> Damage b
<br /> Each n,.curr-e.,ee
<br /> General Aggregate
<br /> Personal and Adver-fising lnjufy
<br /> Products !'completed Oyer tiOns AggFeg to
<br /> Products V4aV G,Tti
<br /> . 1 .2
<br /> least ( ) year(s) after either- 90 days following Substantial Completion or final payment-,
<br /> whieheNrer- is earlier.
<br /> .3 The pehey shall he endOFsed. to have the Gene~., 1 Aggregate seats ., ply to this D.• t only.
<br /> pa r..v.�^r^vu v' ..uaal vV uva uV V VV11V1K
<br /> "4997-. J ---. .. anee shall include eeNrefage suffieient to fneet the obligations inSeetion 3 . 18
<br /> § 8. 1 .3 Automobile Liability (owned , Ron owned and hifed vehieles) fef bodily injuify and pfoper-t:y damage:
<br /> Each Aeoident
<br /> § 8. 1.4
<br /> limits. Geonmer-eial Geneffil Liability and ,lutemebile Liabilily limits may be attained by individual peheies or- by a
<br /> Liability Insurance is to he . ided . tate the rill. :~ here. i
<br /> AIA Document A121 T mCMc — 2003 and AGC Document 565. Copyright ® 1991 and 2003 by The American Institute of Architects and The Associated
<br /> General Contractors of America. All rights reserved. WARNING : This document is protected by U.S. Copyright Law and International Treaties. 18
<br /> Unauthorized reproduction or distribution of this document, or any portion of it, may result in severe civil and criminal penalties, and will be
<br /> prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 17 :00:26 on 05/25/2005 under Order
<br /> No. 1000126313_1 which expires on 6/29/2005 , and is not for resale.
<br /> User Notes : (3163795107)
<br />
|