§ 2.3 CONSTRUCTION PHASE <br /> § 2.3. 1 GENERAL <br /> § 2.3. 1 . 1 The Construction Phase shall commence on the Owner' s written acceptance of the pe�r�Construction <br /> Manager' s Guaranteed Maximum Price proposal and the issuance of a Notice to Proceed. <br /> ( 1 ) the Owner' s aeeeptanee of the Censtr-uetien Manager' s Guaranteed Maximum Pr-iee proposal and. <br /> ..F ., N : ee to Proses, <br /> e et .. <br /> (2) the Owner' s first autherization to the Const uetio Manager- <br /> (a) ayArafd ., ubeentr., et <br /> , <br /> (b) undertake e nstmetion Work with the Construction AR .. ,,. ger-' s o F or <br /> w� undertake VVa.s al »Val Vaa Work ♦. LLiI Ll3V L.VLIJLL »V{LV1I r�r , <br /> !e\ issue « pileuuoc order- for materials rojPdcnrad for- the W 1 - <br /> § 2.3.2 ADMINISTRATION <br /> § 2. 3.2 . 1 Those portions of the Work that the Construction Manager does not customarily perform with the <br /> Construction Manager ' s own personnel shall be performed under subcontracts or by other appropriate agreements <br /> with the Construction Manager. The Construction Manager shall obtain bids from Subcontractors and from suppliers <br /> of materials or equipment fabricated to a special design for the Work from the list previously reviewed and, after <br /> analyzing such bids, shall deliver such bids to the Owner and Architect. The Owner will then determine , with the <br /> advice of the Construction Manager and subject to the reasonable objection of the Architect, which bids will be <br /> accepted. The Owner may designate specific persons or entities from whom the Construction Manager shall obtain <br /> bids ; however, if the Guaranteed Maximum Price has been established , the Owner may not prohibit the Construction <br /> Manager from obtaining bids from other qualified bidders . The Construction Manager shall not be required to <br /> contract with anyone to whom the Construction Manager has reasonable objection. <br /> § 2.3.2 .2 If the Guaranteed Maximum Price has been established and a specific bidder among those whose bids are <br /> delivered by the Construction Manager to the Owner and Architect ( 1 ) is recommended to the Owner by the <br /> Construction Manager; (2) is qualified to perform that portion of the Work; and (3) has submitted a bid which <br /> conforms to the requirements of the Contract Documents without reservations or exceptions, but the Owner requires <br /> that another bid be accepted, then the Construction Manager may require that a change in the Work be issued to <br /> adjust the Contract Time and the Guaranteed Maximum Price by the difference between the bid of the person or <br /> entity recommended to the Owner by the Construction Manager and the amount of the subcontract or other <br /> agreement actually signed with the person or entity designated by the Owner. <br /> § 2.3.2.3 Subcontracts and agreements with suppliers furnishing materials or equipment fabricated to a special design <br /> shall conform to the payment provisions of Sections 7 . 1 . 8 and 7 . 1 .9 and shall not be awarded on the basis of cost <br /> plus a fee without the prior written consent of the Owner. <br /> § 2.3.2.4 The Construction Manager shall schedule and conduct meetings at which the Owner, Architect, <br /> Construction Manager and appropriate Subcontractors can discuss the status of the Work. The Construction <br /> Manager shall prepare and promptly distribute meeting fninute :minutes to attendees . <br /> § 2 .3 .2 .5 Promptly after the Owner ' s acceptance of the Guaranteed Maximum Price proposal , the Construction <br /> Manager shall prepare a schedule in accordance with Section 3 . 10 of A201TM- 1997 , as modified , including the <br /> Owner ' s occupancy requirements . <br /> § 2. 3.2.6 The Construction Manager shall provide monthly written reports to the Owner and Architect on the <br /> progress of the entire Work. The Construction Manager shall maintain a daily log containing a record of weather, <br /> Subcontractors working on the site, number of workers, Work accomplished , problems encountered and other <br /> similar relevant data as the Owner may reasonably require. The log shall be available to the Owner and Architect <br /> that shall be at least monthly and in writing . The Construction Manager acknowledges and Arnehitecc—agrees that <br /> Section 8 . 2 . 3 of the A201TM- 1997 , as modified, is applicable in such circumstances . <br /> § 2.3 .2.7 The Construction Manager shall develop a system of cost control for the Work, including regular <br /> monitoring of actual costs for activities in progress and estimates for uncompleted tasks and proposed changes . The <br /> AIA Document A121 n"CMc — 2003 and AGC Document 565. Copyright ® 1991 and 2003 by The American Institute of Architects and The Associated <br /> General Contractors of America. All rights reserved. WARNING : This document is protected by U.S. Copyright Law and International Treaties. 6 <br /> Unauthorized reproduction or distribution of this document, or any portion of It, may result In severe civil and criminal penalties, and will be <br /> prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 17:00:26 on 05/25/2005 under Order <br /> No. 1000126313_1 which expires on 6/29/2005, and is not for resale. <br /> User Notes: (3163795107) <br />