r i > requirements if requested in writing by the Construction Manager specifying the reason for the needed
<br /> information .
<br /> § 3. 1 .2 The Owneiz shall , at the written Fequest of theCOH417110tionManagef prior to Goffiffieficement of th
<br /> G.enstruention Phase and ther-eafter, furnish to the Constfuet; aa ManageFreasonable evidenee that financial
<br /> arrangements have been fnade to fulfill the Ownef' s ebligaiiAw; undpw thp. Contract. Fumishing of sueh e�ridefiee
<br /> Managef.
<br /> § 3. 1 . 3 The Owner shall establish and update an overall budget for the Project, based on consultation with the
<br /> Construction Manager and Architect, which shall include contingencies for changes in the Work and other costs
<br /> which are the responsibility of the Owner.
<br /> § 3.1 .4 STRUCTURAL AND ENVIRONMENTAL TESTS , SURVEYS AND REPORTS
<br /> In the Preconstruction Phase, the Owner shall furnish the following with reasonable promptness and at the Owner ' s
<br /> expense. Except to the extent that the Construction Manager knows of any inaccuracy, the Construction Manager
<br /> shall be entitled to rely upon the accuracy of any such information, reports, surveys , drawings and tests described in
<br /> Sections 3 . 1 .4 . 1 through 3 . 1 .4.4 but shall exercise customary precautions relating to the performance of the Work.
<br /> § 3 . 1 .4.1 Reports , surveys, drawings and tests concerning the conditions of the site which are required by law.
<br /> § 3. 1 .4.2 Surveys describing physical characteristics , legal limitations and utility locations for the site of the Project,
<br /> and a written legal description of the site. The surveys and legal information shall include, as applicable, grades and
<br /> lines of streets, alleys , pavements and adjoining property and structures ; adjacent drainage ; rights -of-way,
<br /> restrictions , easements, encroachments , zoning, deed restrictions, boundaries and contours of the site ; locations ,
<br /> dimensions and necessary data pertaining to existing buildings , other improvements and trees ; and information
<br /> concerning available utility services and lines, both public and private, above and below grade, including inverts and
<br /> depths. All information on the survey shall be referenced to a project benchmark .
<br /> § 3 . 1 .4.3 The services of a geotechnical engineer when such services are requested by the Construction Manager.
<br /> Such services may include but are not limited to test borings , test pits , determinations of soil bearing values,
<br /> percolation tests, evaluations of hazardous materials , ground corrosion and resistivity tests, including necessary
<br /> operations for anticipating subsoil conditions, with reports and appropriate professional recommendations .
<br /> § 3 . 1 . 4.4 Structural, mechanical , chemical, air and water pollution tests , tests for hazardous materials, and other
<br /> laboratory and environmental tests, inspections and reports which are required by law .
<br /> § 3 . 1 .4.5 The services of other consultants when such services are reasonably required by the scope of the Project and
<br /> are requested by the Construction Manager-.Manager and agreed to by the Owner.
<br /> § 3.2 OWNER'S DESIGNATED REPRESENTATIVE
<br /> The Owner shall designate in writing a representative who shall have express authority to bind the Owner with
<br /> respect to all matters requiring the Owner' s approval or authorization. This representative shall have the authority to
<br /> make deeisiefis-decisions, limited as provided in the Owner ' s written authorization on behalf of the Owner
<br /> concerning estimates and schedules , construction budgets , and changes in the Work, and shall render such decisions
<br /> promptly and furnish information expeditiously, so as to avoid unreasonable delay in the services or Work of the
<br /> Construction Manager. E:eept as otherwise pre_ided in Seetio . 4 . 2 . 1 Decisions outside of the scope of delegated
<br /> authority of A20 } TM—��the Owner' s Representative must be made by the Owner. The Architect does not have
<br /> such authority.
<br /> § 3.3 ARCHITECT
<br /> The Owner shall retain an Architect to provide Basic Services, including normal structural, mechanical and
<br /> electrical engineering services , other than cost estimating services , described in the edition of AIA® Document
<br /> B 151TM 1997 , A - vi ted B 141 TM- 1997 . Standard Form of Agreement Between Owner and A :e Architect,
<br /> as modified , current as of the date of this Agreement. The Owner shall authorize and cause the Architect to provide
<br /> those Additional Services described in B151TM 1997 , request adB141TM- 1997 , as modified ,requested by the
<br /> Construction Manager which must necessarily be provided by the Architect for the Preconstruction and Construction
<br /> AIA Document A121 TmCMc — 2003 and AGC Document 565. Copyright m 1991 and 2003 by The American Institute of Architects and The Associated
<br /> General Contractors of America. All rights reserved. WARNING : This document is protected by U.S. Copyright Law and International Treaties. $
<br /> Unauthorized reproduction or distribution of this document, or any portion of It, may result in severe civil and criminal penalties, and will be
<br /> prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 17 :00:26 on 05/25/2005 under Order
<br /> No. 1000126313_1 which expires on 6/29/2005, and is not for resale.
<br /> User Notes : (3163795107)
<br />
|