My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-393
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-393
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 3:26:43 PM
Creation date
9/30/2015 10:18:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/14/2006
Control Number
2006-393
Agenda Item Number
7.J.
Entity Name
Poole & Kent Company of Florida
Subject
North County Water Treatment Plant Expansion - Utilities
Supplemental fields
SmeadsoftID
5953
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii. Membranes <br /> iv. Cartridge Filters <br /> v. Start-up Services <br /> vi. Performance Testing <br /> 10 . Paintings and Coatings <br /> 11 . Chemical Systems <br /> i. Acid <br /> ii. Antiscalant <br /> iii. Caustic <br /> iv. Fluoride <br /> v. Zinc Orthophosphate <br /> 12. Membrane Cleaning Systems <br /> 13 . Degasifiers <br /> 14. Clearwell <br /> 15 . Odor Control Systems <br /> 16 . Concentrate Treatment Systems <br /> 17 . Chlorine Systems Equipment <br /> 18 . Transfer and High Service Pumps <br /> 19. Electrical <br /> 20 . HVAC <br /> 21 . Process Instrumentation <br /> 22. Computer Control Systems <br /> 23 . Incoming Switchgear <br /> 24. Back-up Generator <br /> 25 . MCC 's <br /> 26. Security System <br /> ARTICLE 2 ENGINEER <br /> The project has been designed by Camp Dresser & McKee Inc., hereinafter called ENGINEER, and who is <br /> to act as OWNER'S representative, assume all duties and responsibilities and have the rights and authority <br /> assigned to ENGINEER in the Contract Documents in connection with completion of the work in <br /> accordance with the Contract Documents. <br /> ARTICLE 3 CONTRACT TIME <br /> 3 . 1 The CONTRACTOR shall be substantially completed with the 3 . 0 million gallon ground storage <br /> tank portion of the contract one hundred eighty ( 180) calendar days after issuance of the Notice <br /> to Proceed . <br /> The CONTRACTOR shall be substantially complete with the installation of the one new skid in <br /> the existing process bay and the replacement of the membranes in the existing two skids three <br /> hundred sixty (360) calendar days from the issuance of the Notice to Proceed. <br /> The CONTRACTOR shall be substantially completed with the remaining work six hundred <br /> (600) calendar days after issuance of the Notice to Proceed, in accordance with Paragraph 2.03 <br /> of the General Conditions, and be completed and ready for final payment in accordance with <br /> Paragraph 14.07 of the General Conditions within seven hundred twenty (720) calendar days <br /> after the issuance of the Notice to Proceed . <br /> 6706-43015- 155\9/7/06 00530-2 VRB <br />
The URL can be used to link to this page
Your browser does not support the video tag.