My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-393
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-393
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 3:26:43 PM
Creation date
9/30/2015 10:18:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/14/2006
Control Number
2006-393
Agenda Item Number
7.J.
Entity Name
Poole & Kent Company of Florida
Subject
North County Water Treatment Plant Expansion - Utilities
Supplemental fields
SmeadsoftID
5953
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shall promptly make payment to the CONTRACTOR unless such amounts are the subject of a good <br /> faith dispute; the subject of a claim pursuant to Florida Statutes section 255 .05 (2005) ; or otherwise <br /> the subject of a claim or demand by the County as OWNER or the CONTRACTOR. The <br /> CONTRACTOR acknowledges that where such retainage is attributable to the labor, services, or <br /> materials supplied by one or more subcontractors or suppliers, the Contractor shall timely remit <br /> payment of such retainage to those subcontractors and suppliers. Pursuant to Florida Statutes <br /> section 218 .735(8)(c)(2005), CONTRACTOR further acknowledges and agrees that: 1 ) the County <br /> as OWNER shall receive immediate written notice of all decisions made by CONTRACTOR to <br /> withhold retainage on any subcontractor at greater than five percent (5%) after fifty percent (50%) <br /> completion; and 2) CONTRACTOR will not seek release from the County as OWNER of the <br /> withheld retainage until the final pay request. <br /> 5 .3 Paragraphs 5 . 1 . 1 and 5 .2 do not apply to construction services work purchased by the County as <br /> OWNER which are paid for, in whole or in part, with federal funds and are subject to federal <br /> grantor laws and regulations or requirements that are contrary to any provision of the Local <br /> Government Prompt Payment Act. In such event, payment and retainage provisions shall be <br /> governed by the applicable grant requirements and guidelines . <br /> 5 .4 ACCEPTANCE AND FINAL PAYMENT: Upon receipt of written notice that the work is ready <br /> for final inspection and acceptance, the ENGINEER will promptly make such inspection and <br /> when the ENGINEER finds the work acceptable under the terms of the Contract and the Ci�ntract <br /> fully performed, the ENGINEER will promptly issue a final completion certificate staling that <br /> the work provided for in this Contract has been completed, and acceptance by the OWNER <br /> under the terms and the conditions thereof is recommended and the entire balance found to be <br /> due the CONTRACTOR, will be paid to the CONTRACTOR by the OWNER following County <br /> Commission approval of the final Contract payment. <br /> 5 . 5 Acceptance of Final Payment as Release. The acceptance by the CONTRACTOR of final <br /> payment shall be and shall operate as a release to the OWNER from all claims and all liability to <br /> the CONTRACTOR other than claims in stated amounts as may be specifically excepted by the <br /> CONTRACTOR for all things done or furnished in connection with the work under this Contract <br /> and for every act and neglect of the OWNER and others relating to or arising out of the work. <br /> Any payment, however, final or otherwise, shall not release the CONTRACTOR or its sureties <br /> from any obligations under the Contract Documents or the Payment and Performance Bonds . <br /> ARTICLE 6 INTEREST <br /> Not Applicable. <br /> ARTICLE 7 CONTRACTOR' S REPRESENTATIONS <br /> In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following <br /> representations: <br /> 7. 1 CONTRACTOR has familiarized itself with the nature and extent of the Contract Documents, <br /> work, site, locality, and all local conditions and laws and regulations that in any manner may affect <br /> cost, progress, performance or furnishing of the work. <br /> 7.2 CONTRACTOR has studied carefully all reports of explorations and tests of subsurface conditions <br /> and drawings of physical conditions which are identified in the Supplementary Conditions as <br /> 6706-43015- 155\9/7/06 00530-4 VRB <br />
The URL can be used to link to this page
Your browser does not support the video tag.