My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-262
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-262
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:53:17 AM
Creation date
9/30/2015 9:53:17 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/18/2006
Control Number
2006-262
Agenda Item Number
7.V.
Entity Name
Divosta Homes, LP
Subject
delivery of reclaimed water to Waterway Village
Area
King's Highway area
Supplemental fields
SmeadsoftID
5750
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
expense, shall install the following items including but not limited to reclaimed water meter, <br /> transmission lines , pumps, valves , storage facilities , backflow prevention devices , irrigation <br /> equipment, control valves, metering , remote monitoring and telemetry system , and associated <br /> appurtenances from the County's Reclaimed Water main located within the Lateral H canal <br /> adjacent to the easterly boundary of the Property to a non-pressurized surface storage system <br /> located on the Property (the foregoing collectively " Reclaimed Water System ") . <br /> 1 . 2 The Developer acknowledges and agrees that: the Reclaimed Water delivered by <br /> the COUNTY: will not be provided under pressure; and shall be delivered to a non-pressurized <br /> surface storage system located on the Property. <br /> 1 . 3 The DEVELOPER shall install a Reclaimed Water flow monitoring and recording <br /> device (hereinafter referred to as a "Reclaimed Water Meter") to monitor the volume of <br /> Reclaimed Water delivered to the DEVELOPER. The COUNTY will determine the location of <br /> the Reclaimed Water Meter on the DEVELOPER 'S Property. The COUNTY shall be granted <br /> reasonable access to the Reclaimed Water System . The Reclaimed Water System shall be <br /> reviewed and approved by the COUNTY prior to installation . <br /> 1 .4 The DEVELOPER covenants that it shall not directly discharge Reclaimed Water <br /> into any water body of the State of Florida other than to the impoundment owned and <br /> maintained by the DEVELOPER . DEVELOPER shall take all reasonable precautions to prevent <br /> the use of Reclaimed Water as potable water. " Reclaimed Water in Use" warning signs shall <br /> be strategically posted in accordance with F.A. C . Rule 62-610. In addition , exposed reclaimed <br /> water piping shall be painted 'Pantone Purple 522C . DEVELOPER's Reclaimed Water System <br /> shall be operated , maintained , and administered in a manner which adheres to the codes , <br /> standards , and guidelines established by the COUNTY and the applicable regulatory agencies . <br /> 1 . 5 The DEVELOPER shall use the Reclaimed Water to irrigate the Property in a <br /> manner consistent with all Federal , State and local laws and regulations. The DEVELOPER <br /> shall file a written plan ("Reclaimed Water Use Protocol") with SJRWMD , FDEP, and the <br /> COUNTY, that outlines the intended use of the Reclaimed Water. The Reclaimed Water Use <br /> Protocol shall be updated and amended in writing whenever the intended use materially <br /> changes. The DEVELOPER shall strictly comply with all Federal , State and local regulations <br /> with respect to the discharge of any Reclaimed Water into State of Florida waters . <br /> 1 . 6 . The DEVELOPER shall obtain FDEP and all other approvals to deliver and apply <br /> Reclaimed Water to DEVELOPER's Property. If, through no fault of the parties involved , any <br /> federal , state or local government or agency (excluding the COUNTY) fail to issue necessary <br /> permits , grant necessary approvals , or require a material change in the Reclaimed Water <br /> System , then to the extent necessary and if possible , the parties agree to negotiate an <br /> amendment to the Agreement to reflect the change in condition . If it becomes impossible or <br /> impracticable to perform under the terms of this Agreement because of the above, then this <br /> Agreement shall terminate and the parties shall have no further obligations to the other. <br /> 2 . 0 Quality of Reclaimed Water: Volume Allocation : Failure to Deliver Reclaimed Water: <br /> 2. 1 The COUNTY will provide Reclaimed Water meeting the standards set forth by the <br /> Florida Department of Environmental Protection as defined in the COUNTY's Wastewater <br /> Treatment Facility (WWTF) Operating Permit for Reclaimed Water. Sampling for conformance <br /> with Reclaimed Water quality shall be performed at the location and frequency defined in the <br /> FDEP WWTF Operating Permit. Only Reclaimed Water meeting FDEP water quality standards <br /> will be delivered to the DEVELOPER. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.