My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-235
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-235
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2016 1:38:31 PM
Creation date
9/30/2015 10:59:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/24/2007
Control Number
2007-235
Agenda Item Number
7.T.
Entity Name
SPS Contracting, Inc.
Subject
Agreement construct sewage force main
Area
CR 510 west pf SR A1 A
Supplemental fields
SmeadsoftID
6408
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shall complete the following tasks : <br /> 1 . Obtain all necessary permits. <br /> 2. Receive approved shop drawings for all materials and equipment to be <br /> utilized in the job . <br /> 3 . Perform all photographic recording and documentation of conditions prior <br /> to construction . <br /> 4 . Locate all existing utilities in the area of work . <br /> 5. Mobilize all labor, equipment , and materials. <br /> 6 . Deliver and store all equipment and materials to the job site. <br /> 7 . Notify all utilities and other affected parties prior to initiating construction . <br /> (b) From 16 calendar days to 75 calendar days from the effective date of Notice to <br /> Proceed , the CONTRACTOR shall complete the following tasks: <br /> 1 . Install all pipe and appurtenant items. <br /> 2. Perform all testing . <br /> 3 . Restore all disturbed areas to their pre-construction condition . <br /> 4. Correct all deficiencies noted by Engineer. <br /> Completion of all tasks outlined above (i . e . , Subparagraphs a) and b) constitutes <br /> Substantial Completion . <br /> (b) From 76 calendar days to 100 calendar days from the effective date of Notice to <br /> Proceed , the CONTRACTOR shall complete the following tasks: <br /> 1 . Clean up project area . <br /> 2. Remove all equipment and material from project site. <br /> 3. Perform contract closeout procedures. <br /> Completion of all tasks outlined above (i .e . , Subparagraphs a , b, and c) constitute Final <br /> Completion . <br /> 3 .2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the <br /> essence of this Agreement and that OWNER will suffer financial loss if the work is not <br /> completed within the times specified in Paragraph 3. 1 above, plus any extensions thereof <br /> allowed in accordance with Article 12 of the General Conditions. They also recognize the <br /> delays, expense and difficulties involved in proving in a legal proceeding the actual loss <br /> suffered by OWNER if the work is not completed on time. Accordingly, instead of <br /> requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages <br /> for delay (but not as a penalty) CONTRACTOR shall pay OWNER four-hundred and fifty <br /> dollars ($450.00) for each day that expires after the time specified in Paragraph 3 . 1 for <br /> Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to complete the <br /> remaining work within the Contract Time or any proper extension thereof granted by <br /> OWNER, CONTRACTOR shall pay OWNER four-hundred and fifty dollars ($450 .00) for <br /> each day that expires after the time specified in Paragraph 3. 1 for completion and <br /> readiness for final payment. <br /> ARTICLE 4 CONTRACT PRICE <br /> 00530-2 <br /> HKPrcjects\0649\Bidding contract Spacifications\Spec Templatet2007T00530W,greement between Owner Contractor Rev. <br /> 012507.doc <br />