My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-043
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2016 2:19:48 PM
Creation date
9/30/2015 10:34:17 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/06/2007
Control Number
2007-043
Agenda Item Number
11.J.3
Entity Name
SPS Contracting, Inc.of Vero Beach
Subject
Force main for waste water transmission
Area
82nd Ave. and 8th St. to9 58th Ave. and 5th St. SW
Project Number
UCP-2628
Bid Number
2007028
Supplemental fields
SmeadsoftID
6111
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
X75 <br /> 2- 007 - ou 3 <br /> SECTION 00530 - EJCDC <br /> STANDARD FORM OF AGREEMENT <br /> BETWEEN OWNER AND CONTRACTOR <br /> ON THE BASIS OF A STIPULATED PRICE <br /> THIS AGREEMENT, dated the �f —day of n the year and <br /> between Indian River County, a political subdivision of the the S�orida hereinafter called <br /> Y P ( <br /> OWNER) and CPS Contracting, Inc_ of Vero Reach„ Florida (hereinafter called <br /> CONTRACTOR) . <br /> OWNER and CONTRACTOR , in consideration of the mutual covenants hereinafter set forth , <br /> agree as follows: <br /> ARTICLE 1 . WORK <br /> CONTRACTOR shall complete all work as specified or indicated in the Contract Documents . The <br /> work is generally described as follows: <br /> Furnish all labor, equipment, and materials necessary to construct approximately <br /> 24, 113-LF of 24-inch forcemain including , but not necessarily limited to , a total of <br /> 3489-LF horizontal directional drill at seven (7) locations, all fittings, pipe, <br /> appurtenances, clearing , restoration , and all testing as shown on the drawings and <br /> as depicted in these documents . <br /> CONTRACTOR, as an independent contractor and not as an employee, shall furnish , for the sum <br /> amount of !93,27F,76�Q9, all of the necessary labor, material, and equipment to perform the work <br /> described above in accordance with the Contract Documents . <br /> ARTICLE 2. ENGINEER <br /> The project has been designed by Kimley-Horn and Associates, Inc. , hereinafter called <br /> ENGINEER, and who is to act as OWNER'S representative, assume all duties and responsibilities <br /> and have the rights and authority assigned to ENGINEER in the Contract Documents in <br /> connection with completion of the work in accordance with the Contract Documents . <br /> ARTICLE 3. CONTRACT TIME. <br /> 3 . 1 The work will be completed in accordance with the following time frame. <br /> (a) Within 21Q calendar days from the effective date of Notice to Proceed , the <br /> CONTRACTOR shall complete the following tasks : <br /> 1 . Install all pipes , valves, and appurtenant items . <br /> 3 . Perform all testing . <br /> 044572015 <br /> 00530- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.