Laserfiche WebLink
data, will be made available to the ENGINEER by the COUNTY . The Geotechnical <br /> Engineer will provide recommended LBR and soil survey data to the ENGINEER. <br /> 5 . Signing and pavement marking plans will be provided at the 90% and 100% stages <br /> of design. <br /> 6 . Permit application submittals will be made subsequent to the 90% plan set submittal <br /> approval by the COUNTY . <br /> E . Bridge Plans <br /> All structural plans and designs are to be prepared with English values in accordance with all <br /> applicable current manuals , memorandums , guidelines and other documents listed below : <br /> o AASHTO LRFD Bridge Specifications and Interims <br /> o AASHTO Standard Specifications for Structural Supports for Highway Signs , <br /> Luminaries and Traffic Signals, dated 1994 <br /> o Florida Department of Transportation (FDOT) Structures Design Guidelines <br /> o FDOT Structures Detailing Manual <br /> o FDOT Structures Standard and Semi- Standard Drawings <br /> o FDOT Bridge Load Rating Permitting And Posting Manual <br /> The bridge plans will include bridges at the following locations : <br /> New Bridge carrying the CR 510 mainline over the Lateral "D " Canal . <br /> Modify existing bridge over the Lateral "D" Canal for access to Vero Lakes Estates . <br /> Replace existing bridge over Lateral "C " Canal, west of proposed 82nd Avenue and <br /> coordination with FDOT ' s 82nd Avenue Consultant. <br /> Replace existing bridge over Lateral "A" Canal, Station 174+80 . <br /> 1 . Bridge Report — The ENGINEER shall prepare a Bridge Report (BR) . The BR shall <br /> be submitted as part of the Phase I Roadway Submittal, General Requirements . <br /> Issues to be considered in the BR include Bridge Geometry, Short- Span vs . Medium- <br /> Span Concrete, Pier/Bent Types, Deep Foundations , TCP/Staged Construction <br /> Requirements, Constructability Requirements , Abutment Slope/Wall Evaluation and <br /> Quantity and Cost Estimates . All bridges will be designed and plans prepared for the <br /> ultimate six lane divided roadway. <br /> 2 . Final Design — Bridge and box culvert plans will be submitted at the stages identified <br /> in Section D . All bridges will be designed and plans prepared for the ultimate six <br /> lane divided roadway. Design and prepare plans for three new box culverts using the <br /> FDOT ' s LRFD Box Culvert Program. All quantities and cost estimates will be <br /> provided at 90% and 100% submissions . The following tasks will be addressed in <br /> the development of the final design and the final plans : <br /> General Layout Design and Plans <br /> • Overall Bridge Final Geometry <br /> • Expansion/Contraction Analysis <br /> • General Plan and Elevation <br /> • Construction Staging <br /> • Approach Slab Plan and Details <br /> • Miscellaneous Details <br /> End Bent Design and Plans <br /> Page 8 of 16 <br /> CR 510 Design Agreement20051104 .doc November 7, 2005 <br />