Laserfiche WebLink
7C. <br /> SECTION 00530 - EJCDC <br /> STANDARD FORM OF AGREEMENT <br /> BETWEEN OWNER AND CONTRACTOR <br /> ON THE BASIS OF A STIPULATED PRICE <br /> THIS AGREEMENT ("Agreement" or "Contract" ) , dated the 2e day of November in the year <br /> 2007 by and between Indian River County, a political subdivision of the State of Florida ( hereinafter <br /> called OWNER) and Timothy Rose Contracting Inc. (hereinafter called CONTRACTOR). <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth , agree <br /> as follows : <br /> ARTICLE 1 WORK <br /> CONTRACTOR as an independent contractor and not as an employee shall furnish and complete <br /> all of the necessary labor, material , and equipment to perform the work as specified or indicated in <br /> the Contract Documents . The work is generally described as follows: <br /> A. CONTRACTOR shall complete all work as specified or indicated in the Contract <br /> Documents. The work is generally described as follows which shall include, but is <br /> not necessarily limited to the following . <br /> Construction of approximately 660 LF of 6" PVC water main , 410 LF of 2 " PE <br /> water main , 1 Fire Hydrant Assembly and 18 water services on 61st Avenue north <br /> of 41 " Street in Indian River County, FL. Construction consists of, but is not <br /> limited to, utilities exploration , coordination with any permitting agencies, <br /> trenching , dewatering , installation of pipe with fittings and all appurtenances , <br /> restrainers, soil compaction , disinfection , testing (includes providing temporary <br /> jumper or another approved method for filling , disinfection and flushing ) , <br /> sampling and bacteriological testing , irrigation repair, private property <br /> replacement or repair, franchise utility repair and traffic control . PVC pipe shall <br /> be C-900 per Indian River County Utility Standards and Specifications . <br /> ARTICLE 2 ENGINEER <br /> The project has been designed by Gordon E . Sparks, P. E. , hereinafter called ENGINEER, and who <br /> is to act as OWNER'S representative, assume all duties and responsibilities and have the rights <br /> and authority assigned to ENGINEER in the Contract Documents in connection with completion of <br /> the work in accordance with the Contract Documents . <br /> ARTICLE 3 CONTRACT TIME <br /> 3. 1 The CONTRACTOR shall be substantially completed with the following timeframe <br /> (a) Within 15 calendar days from effective date of Notice to Proceed , Contractor <br /> shall complete the following tasks : <br /> 00530- 1 <br /> H\Projects\0649\Bidding Contract Specifications\Spec Template\2007\0050\Agreement between Owner Contractor Rev. <br /> 012507. doc <br />