Laserfiche WebLink
SECTION 00530 - EJCDC <br /> STANDARD FORM OF AGREEMENT <br /> BETWEEN OWNER AND CONTRACTOR <br /> ON THE BASIS OF A STIPULATED PRICE <br /> THIS AGREEMENT dated the 21 st day of February in the year 2006 by and <br /> between Indian River County, a political subdivision of the State of Florida (hereinafter called <br /> OWNER) and Underground 11tiliti - s , Inn- (hereinafter called CONTRACTOR) . <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth , <br /> agree as follows: <br /> ARTICLE 1 . WORK <br /> CONTRACTOR shall complete all work as specified or indicated in the Contract Documents . The <br /> work is generally described as follows: <br /> Construction of approximately 1 , 100 LF of 6 " PVC water main , 2 Fire Hydrant Assemblies <br /> and 19 water services for the Point - O — Woods Subdivision Water Assessment project <br /> in Roseland , FL . Construction consists of, but is not limited to, utilities exploration , <br /> coordination with any permitting agencies, trenching , dewatering , installation of pipe <br /> with fittings and all appurtenances , restrainers , soil compaction , disinfection , testing <br /> ( includes providing temporary jumper or another approved method for disinfection and <br /> flushing) , irrigation repair, private property replacement or repair, franchise utility repair <br /> and traffic control . PVC pipe shall be C -900 per Indian River County Utility Standards <br /> and Specifications . <br /> CONTRACTOR, as an independent contractor and not as an employee , shall furnish , for the sum <br /> amount of $49 .710 .00 , all of the necessary labor, material, and equipment to perform the work <br /> described above in accordance with the Contract Documents. <br /> ARTICLE 2 . ENGINEER <br /> The project has been designed by Gordon E . Sparks , P . E . , Environmental Engineer, Indian River <br /> County Utilities Department , hereinafter called ENGINEER, and who is to act as OWNER'S <br /> representative , assume all duties and responsibilities and have the rights and authority assigned <br /> to ENGINEER in the Contract Documents in connection with completion of the work in <br /> accordance with the Contract Documents . <br /> 00530 EJCDC - Agreement between Owner and Contractor <br /> 00530- 1 <br /> C:OOCUME- 1\gordons\LOCALS- I\TeMV)0530 EJCDC - Agreerneot between Owner and Contractor.doc <br />