of Environmental Protection (FDEP). The DEVELOPER shall not commence construction until all
<br /> permits are approved and obtained.
<br /> 8 . Definition
<br /> All pronouns shall be deemed to refer to the masculine, feminine, or neuter, singular or plural, as the
<br /> identity of the party or parties may require.
<br /> 9 . DEVELOPER ' s Obligations :
<br /> The DEVELOPER shall prepare at its own expense, plans, specifications , Agreement, advertisement,
<br /> general conditions , hereinafter referred to as the " contract documents", for the lines and facilities
<br /> necessary to deliver the water and wastewater utilities from the COUNTY ' S facilities . All plans and
<br /> specification shall be subject to the COUNTY' s approval prior to the DEVELOPER' s application.
<br /> The DEVELOPER shall be responsible for all costs associated with the design, permitting and
<br /> construction of the offsite facilities (which includes but is not limited to transmission lines, valves,
<br /> fittings, hydrants , meters, and associated appurtenances) whether designed, permitted or constructed
<br /> by the DEVELOPER or the COUNTY.
<br /> The design, permitting, construction, operation and maintenance of all on-site water and wastewater
<br /> utilities which is on or solely dedicated to the DEVELOPER ' s property (including but not limited to
<br /> water meter, transmission lines, pumps, valves, storage facilities, etc . ) shall be the DEVELOPER ' s
<br /> responsibility and expense. Construction of on-site water and wastewater utilities shall be subject to
<br /> COUNTY review and approval .
<br /> The DEVELOPER shall be deemed in possession of the potable water on the DEVELOPER ' s side of
<br /> the water meter, however the DEVELOPER shall not be deemed to own the water and the transfer or
<br /> sale of water by the DEVELOPER is prohibited.
<br /> The DEVELOPER may not transfer or sell water or wastewater capacity to any party for use off-site
<br /> of the property.
<br /> 10 . Easements :
<br /> The DEVELOPER shall convey to the COUNTY a utility easement for the water and wastewater
<br /> utilities for the COUNTY to install, maintain, operate and monitor the water and wastewater utilities,
<br /> within the private right-of-way including, but not limited to, water lines, services, laterals, manholes ,
<br /> meters, lift station, sewer, remote monitoring and related utility structures .
<br /> After the COUNTY' S final inspection of the off-site water and wastewater facilities for conformance
<br /> with the approved plans and specifications, the DEVELOPER shall convey all the off-site facilities
<br /> together with an interest in land, as may be required by the COUNTY, to the COUNTY. The
<br /> conveyance shall include any of the following documents as may be required by the COUNTY, in a
<br /> form acceptable to the COUNTY :
<br /> a) Bill of Sale
<br /> b) Grants of Easements
<br /> c) Maintenance Bond
<br /> d) Record Drawings (hard copy and electronic fort — AutoCAD rel . 14 . 0)
<br /> 11 . Entire Agreement
<br /> This Agreement embodies the entire agreement between the parties relative to the subject matter
<br /> hereof, and there is no oral or written agreements between the parties, nor any representations made
<br /> by either party relative to the subject matter hereof, which are not expressly set forth herein.
<br /> 12 . Governing Law & Jurisdiction :
<br /> This Agreement shall be governed by the laws of the State of Florida and the laws of the United
<br /> States pertaining to transactions in such state, and all actions arising out of this Agreement shall be
<br /> Page 3 of 9
<br />
|