My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-147
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2016 1:26:55 PM
Creation date
9/30/2015 10:47:11 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/01/2007
Control Number
2007-147
Agenda Item Number
7.W.
Entity Name
Wharton-Smith, Inc.
Subject
Standard Form Agreement stipulated price
West Regional WWTF Expansion
Area
West Regional WWTF
Supplemental fields
SmeadsoftID
6281
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
291 - I 'i7 <br /> SECTION 00530 - EJCDC <br /> STANDARD FORM OF AGREEMENT <br /> BETWEEN OWNER AND CONTRACTOR <br /> ON THE BASIS OF A STIPULATED PRICE <br /> THIS AGREEMENT ("Agreement" or "Contract"), dated the 1st day of May in the <br /> year 2097 by and between Indian River County, a political subdivision of the State of Florida (hereinafter <br /> called OWNER) and Wharton-Smith , Inc.(hereinafter called CONTRACTOR). <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as <br /> follows: <br /> ARTICLE 1 WORK <br /> CONTRACTOR as an independent contractor and not as an employee shall furnish and complete all of the <br /> necessary labor, material, and equipment to perform the work as specified or indicated in the Contract <br /> Documents. The work is generally described as follows: <br /> This project includes a 2 .0 MGD to 6.0 MGD expansion of the existing facility. The Project includes <br /> demolition of the existing pretreatment structure, anaerobic tanks, old original filter, chlorine contact tank <br /> located due east of the operation building, hydropneumatic tank and pumps and other miscellaneous <br /> demolition included yard piping as depicted on the drawings. New construction will generally include <br /> Pretreatment Structure (Screens and Grit Removal System), Pretreatment Odor Control, Pretreatment Drain <br /> Station, New Biological Treatment Tanks, Existing Oxidation Ditch Modifications, Blower Building, Internal <br /> Recycle Pump Stations, Clarifiers, RAS/WAS Pumps, Clarifier Splitter Box Modifications, Filters, Chlorine <br /> Contact Tanks, Hydropneumatic Tank and pumps, Chemical Feed Systems (Caustic, Methanol, and NaOCI), <br /> Sludge Thickening System, sludge holding tank covers and odor control system, Yard Piping <br /> Electrical/Controls, Instrumentation/SCADA, Landscaping Buffer, Pavement & Grading and Storm water <br /> Management. All ancillary work associated with these systems are to be included. <br /> ARTICLE 2 ENGINEER <br /> The project has been designed by PBS&J, hereinafter called ENGINEER, and who is to act as OWNER'S <br /> representative, assume all duties and responsibilities and have the rights and authority assigned to ENGINEER <br /> in the Contract Documents in connection with completion of the work in accordance with the Contract <br /> Documents. <br /> ARTICLE 3 CONTRACT TIME <br /> 3 . 1 The CONTRACTOR shall be substantially completed with the remaining work Seven Hundred <br /> (700) calendar days after issuance of the Notice to Proceed, in accordance with Paragraph 2 .03 of <br /> the General Conditions, and be completed and ready for final payment in accordance with <br /> Paragraph 14.07 of the General Conditions within Th_ irtvy (30) calendar days after the issuance of <br /> the Notice to Proceed. <br /> 3 .2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this <br /> Agreement and that OWNER will suffer financial loss if the work is not completed within the times <br /> specified in Paragraph 3. 1 above, plus any extensions thereof allowed in accordance with Article 12 <br /> of the General Conditions. They also recognize the delays, expense and difficulties involved in <br /> 00530- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.