Laserfiche WebLink
ATTACHMENT-B <br /> Indian River County Department of Utilities <br /> Construction Cost Estimate <br /> High Street Water Main Extension in Sebastian from CR 512 to Taft Street <br /> 1 -Mar-05 <br /> Bid Item <br /> FQ <br /> ated Unit of Unit Total Labor Material Unit Material <br /> Item No. Description <br /> ntit Measure Price Price Price <br /> Price <br /> 63 Mobilization 1 <br /> 64 Demobilization 0 .05 288 .001 0 .03 <br /> 65 Maintenance of Traffic 172 . 80 <br /> 1 0.05 288 .00 <br /> Old Install 8 " PVC Water Main 320 <br /> LF 10.00 39200. 00 3 .59 1 , 148 . 80 <br /> 16b Install Fire Hydrant Assemblyw/6" Gate Valve & Tee <br /> I EA 1 ,000.00 1 ,000.00 1 ,307 . 00 1 ,307 .00 <br /> OSa Furnish & Install DIP Fittings 0.20 TONS 1 ,500.00 <br /> 6 Make Connection to Existing Main 300.00 55000.00 1 ,000 . 00 <br /> I EA 380.00 380.00 380.00 380.00 <br /> 24 Obtain Bacterial Sample/Deliver to Lab 2 <br /> EA 40.00 80 .00 <br /> 20 Potholes 2 .00 EA <br /> 100.00 200.00 <br /> 60a Lawn/ROW Restoration (Topsoil & Bahia Sod 100 Sy <br /> 00 <br /> 6. 00 600. 1 . 17 117.00 <br /> Subtotal Water Facilities <br /> Total Water Facilities 5 ,760.00 3,952 . 80 <br /> 1 j <br /> 6,508 . 80 <br /> TOTAL ESTIMATED CONSTRUCTION COST : $ 10,461 .60 <br /> DEVELOPER'S SHARE $2,535.06 <br /> OTHER BENEFITTING PROPERTIES $79926.54 <br /> Exhibit B <br /> Contractors Bid Item List <br />