o to g <br />AMENDMENT NO.9 TO THE PROFESSIONAL <br />ENGINEERING SERVICES AGREEMENT <br />66TH AVENUE PAVING AND DRAINAGE IMPROVEMENTS <br />BETWEEN SR 60 AND 4TH STREET <br />IRC PROJECT NO. 9810 <br />THIS is an amendment to the existing AGREEMENT dated NOVEMBER 17, 1998, including <br />AMENDMENTS NUMBER 1 through 8, between CARTER ASSOCIATES, INC. (ENGINEER) and <br />INDIAN RIVER COUNTY (COUNTY). The proposed scope of work includes adding an 8 -foot wide <br />concrete sidewalk, a traffic signal at the 16th Street/College Lane intersection with 66th Avenue, plan <br />revisions for a tie-in at College Lane, utility coordination and modification to address Right of Way <br />acquisition conditions. All provisions of the original Professional Engineering Services Agreement including <br />Amendment Nos. 1 through 8 shall remain in full force and effect, unless otherwise specifically modified. <br />This amendment addresses changes in "TIME OF COMPLETION" of the AGREEMENT. <br />SCOPE OF SERVICES <br />See attached letter from Carter Associates, Inc. dated October 10, 2008, which specifies changes in the <br />"SCOPE OF SERVICES" and "COMPENSATION" and "TIME FOR COMPLETION." <br />COMPENSATION <br />This section of the AGREEMENT entitled SECTION V - COMPENSATION shall be revised in <br />response to the Scope modifications set out herein. The charges associated with this AMENDMENT NO. 9 <br />are as follows: <br />Fees for Engineering Services: Lump Sum Amount $40,480.00 <br />Not to Exceed Amount $600.00 <br />TOTAL Amendment No. 9 $41,080.00 <br />The charges associated with the AGREEMENT (which include changes from Amendments I through 8 and <br />these additional services included in proposed Amendment 9), shall be increased from $441,605.00 to <br />$4821685.00. <br />FAEngineering\Capital Projects\9810-66th Ave, 4th St to SR 60\9810 Amendment 9 10-14-08.doc <br />I <br />