My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-343
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-343
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 9:54:31 AM
Creation date
10/1/2015 12:46:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
10/21/2008
Control Number
2008-343
Agenda Item Number
8.N.
Entity Name
Carter Associates
Subject
Amendment No.9 Services on 66th Ave. Paving Improvements
Area
66th Ave. SR 60 and 4th St. 16th St/College Lane Intersection
Project Number
9810
Supplemental fields
SmeadsoftID
7661
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o <br /> AMENDMENT NO. 9 TO THE PROFESSIONAL <br /> ENGINEERING SERVICES AGREEMENT <br /> 66TH AVENUE PAVING AND DRAINAGE IMPROVEMENTS <br /> BETWEEN SR 60 AND 4TH STREET <br /> IRC PROJECT NO. 9810 <br /> THIS is an amendment to the existing AGREEMENT dated NOVEMBER 17 , 1998 , including <br /> AMENDMENTS NUMBER 1 through 8 , between CARTER ASSOCIATES , INC . (ENGINEER) and <br /> INDIAN RIVER COUNTY (COUNTY) . The proposed scope of work includes adding an 8-foot wide <br /> concrete sidewalk, a traffic signal at the 16th Street/College Lane intersection with 66th Avenue, plan <br /> revisions for a tie-in at College Lane, utility coordination and modification to address Right of Way <br /> acquisition conditions . All provisions of the original Professional Engineering Services Agreement including <br /> Amendment Nos . 1 through 8 shall remain in full force and effect, unless otherwise specifically modified. <br /> This amendment addresses changes in "TIME OF COMPLETION" of the AGREEMENT. <br /> SCOPE OF SERVICES <br /> See attached letter from Carter Associates, Inc . dated October 10, 2008 , which specifies changes in the <br /> "SCOPE OF SERVICES " and "COMPENSATION" and "TIME FOR COMPLETION ." <br /> COMPENSATION <br /> This section of the AGREEMENT entitled SECTION V - COMPENSATION shall be revised in <br /> response to the Scope modifications set out herein. The charges associated with this AMENDMENT NO . 9 <br /> are as follows : <br /> Fees for Engineering Services : Lump Sum Amount $40,480 . 00 <br /> Not to Exceed Amount $600 . 00 <br /> TOTAL Amendment No . 9 $41 ,080 . 00 <br /> The charges associated with the AGREEMENT (which include changes from Amendments I through 8 and <br /> these additional services included in proposed Amendment 9), shall be increased from $441 ,605 . 00 to <br /> $48205 . 00 . <br /> F:\Engineering\Capital Projects\9810-66th Ave, 4th St to SR 60\9810 Amendment 9 10- 14-08.doc <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.