Laserfiche WebLink
CR512, Phase III and CR510 Roadway Improvements <br /> CHANGE ORDER No. 4 <br /> Description of Itemized Bid Schedule <br /> Item No. Description of Chane Quanti Unk Unit Price Price Increase Pdcee <br /> `.Blossom :Ditch -Pi in - <br /> 101 -1 4 Mobilization 1 LS 8 ,500.00 8,500 .00 <br /> 102-1 4 Maintenance of Traffic 1 LS 10.690.00 10.690.00 <br /> 108-1 4 Layout & Asbuilts 1 LS 5,336.00 5,3 36.00 <br /> 110-1 -1 4 Clearing1 LS 550000 <br /> 120-1 4 Excavation & Shoulder Removal 1 LS 1023000 <br /> 1120-6 (4) Embankment 1 ,900 CY 5.00 <br /> 160-4-12 4 T B Stabiliution 12" 2,325 SY 5.50 <br /> 285-7-06 4 8" Base Rock 2,240 SY 13.00 <br /> 334-1 (4 SP 9.5 Su er ave - 1 " 2, 157 SY 4.55 <br /> l'i <br /> 334-2 4 SP 12.5 Su er ave - 1 1f2" 2 157 SY 6 .20 13 373.40 <br /> 552-1 4 4" Concrete Sidewalk 3. 108 SF 4.00 12 432.00 <br /> HC 4 H7C Rams 4 EA 500.00 2.000.130 <br /> 575-1 -1 4 Sod Bahia 2,200 SY 1 .75 3,850.00 <br /> 425-1 -521 4 Type C Inlet 3 EA 2,016.00 6, 048.00 <br /> 425-1-551 4 jyp2 E Inlet 1 EA 3,025.00 3,025.00 <br /> JI 4 5 x 12 J Inlet 1 EA 15,430.00 15 430.00 <br /> EW 85 4 Modified 84" Endwall i EA 30 500.00 30,500.00 <br /> 430-17-320 4 12" RCP 124 LF 56.00 6,944.00 <br /> 430-17-329 41 24" RCP 187 LF 65 .00 12, 155.00 <br /> 430-17-330 4 30" RCP fib LF 79.00 5,372.00 <br /> 430-34-084 4 84" RCP 5 LF 580.00 2,900.00 <br /> SUBTOTAL 215,507.25 0.00 <br /> NET CHANGE 215,507.25 <br />