Laserfiche WebLink
ATTACHMENT A <br />PROJECT WORKPLAN <br />AMBERSAND BEACH NOURISHMENT <br />The PROJECT consists of restoration and maintenance of Atlantic shoreline between DEP Monuments R4 -R17. A large <br />portion of the north segment is located within the Sebastian Inlet State Recreation Area (SRA). Construction costs within <br />the SRA will be shared with the Sebastian Inlet Tax District to assist in meeting inlet bypassing requirements. The <br />PROJECT shall be conducted in accordance with the terms and conditions set forth under this Agreement, all applicable <br />Department of Environmental Protection permits and the eligible project task items established below. All data collection <br />and processing, and the resulting product deliverables, shall comply with the standard technical specifications contained in <br />the Department's Regional Data Collection and Processing Plan and Geographic Information System Plan, unless <br />otherwise specified in the approved Scope of Work (herein after referred to as SOW) for an eligible PROJECT item. <br />These plans may be found at http://www.dep.state.fl.us/beaches/. Three (3) originals and one (1) electronic copy of all <br />written reports developed under this Agreement shall be forwarded to the Department, unless otherwise specified. <br />Task No: Eligible Project Item: <br />2.0 Design and Permitting <br />Professional services required for engineering and design, obtaining environmental permits and other <br />authorizations and the preparation of plans and specifications. This item specifically excludes permit <br />application fees or any other fees paid to the State of Florida. <br />2.1 Pre -Construction Biological Monitoring <br />Continental Shelf Associates, Inc. (CSA), Coastal Eco -Group (CEG) and Applied Technology and <br />Management (ATM) have been retained by Indian River County to conduct pre -construction biological <br />monitoring. Activities included as part of this task involve: surveying transects R-5, R-8 and R-22, collecting <br />quadrant and sediment thickness data along the eight project transects, and surveying the nearshore edge of <br />hardbottom between R-4 and R-12. Total cost for the described services is $201,456.00. The scope of <br />services was approved on October 22, 2007. <br />4.0 Monitoring <br />A monitoring program conducted in accordance with the requirements specified in any and all permits issued <br />by the Department and the US Army Corps of Engineers. A monitoring plan must be submitted and approved <br />in writing by the Department prior to the initiation of monitoring activities. The plan shall be developed in a <br />manner that will coordinate the monitoring activities associated with current shoreline stabilization projects <br />located within or adjacent to the project area and with the Department's Regional Coastal Monitoring <br />Program. <br />4.1 Environmental Monitoring <br />CSA and ATM have been retained by Indian River County to conduct year 2 mitigation reef monitoring <br />services associated with the Ambersand Beach Nourishment Project. Activities included as part of this task <br />involve: Benthic and fish habitat assessments, mitigation reef extent, data analysis and report preparation and <br />regulatory agency coordination/consultation. Total cost for the described services is $32,986.00. The scope <br />of services was approved on October 22, 2007. <br />DEP Agreement No. 07IR3, Attachment A, Page I of 2 <br />