Laserfiche WebLink
"SECTION III — SCOPE OF SERVICES" is being modified to incorporate the following: <br /> 30% plans have been submitted to the County. ARCADIS will prepare 60%, 90%, and 100% <br /> plans . <br /> E. The Roadway set of plans shall consist of the following: <br /> 30% 60% 90% 100% <br /> Cover Sheet X X X <br /> Typical Sections X X X <br /> Summary of Quantities and General Notes X X <br /> Summary of Drainage Structures Sheets X X X <br /> Details X X <br /> Plan and Profile Sheets (40 scale) X X X <br /> Cross Sections at 100 ft interval X X X <br /> Landscape Plans X X X <br /> Signage & Pavement Marking Plans ( 100 scale) X X X <br /> Signalization Plans X X X <br /> Bridge Plans X X X <br /> Intersection Plan & Details X X X <br /> Drainage Maps X X X <br /> NPDES Plans X X <br /> Stormwater Pollution Prevention Plans (SWPPP) X X <br /> Computation Book X <br /> Construction Cost Estimate and Quantities X X X <br /> "SECTION IV - TIME FOR COMPLETION" is being modified to incorporate the following: <br /> The time for completion of the 90% design drawings, permit applications, and Engineer's <br /> Opinion of Probable Construction Cost for the project shall be fifteen ( 15) months from the date <br /> of execution of this ADDENDUM. Once permits are received, 100% design drawings shall be <br /> completed 90 days thereafter. <br /> Page 5 of 11 <br /> F:\Public Works`.Capital Projects\SR6043rd Ave Intersection\Agreements-Agenda�.06-0220 SR60 - 43RD AVE AMENDMENT 19- 1 -06.doc <br />