Laserfiche WebLink
Lead Agency: County' s engineering consultant. <br /> Pre-construction testing for Base Flow : Surface water, monthly (3 tests) ; Discharge, varied times over a 3- <br /> month period <br /> Pre-construction testing for Storm Events : Discharge (6 tests) one each every other months for 12 months via <br /> hand-sampling or automated equipment during storm events <br /> Number of Testing Locations : Inlet and outlet of lake structures, one each <br /> Testing Parameters : Inlet and outlet of lake structures <br /> Temperature, bottom of water column (bottom) <br /> pH, bottom <br /> Salinity, bottom <br /> Dissolved Oxygen, bottom <br /> Temperature, surface of water column (surface) <br /> pH, surface <br /> Salinity, surface <br /> Dissolved Oxygen, surface <br /> Discharge Velocity <br /> Flow <br /> Surface Water Elevation <br /> Total Kjeldahl Nitrogen (TKN) <br /> Nitrate and Nitrate-N <br /> Ammonia-N <br /> Total Phosphorus <br /> Color <br /> Biological Oxygen Demand (BOD) <br /> Total Suspended Solids (TSS) <br /> Alkalinity <br /> Fecal Coliforms <br /> Reporting: <br /> A component of this project involves developing a detailed and systematic record-keeping system to monitor <br /> maintenance activities on each BMP element. Logs will be kept detailing equipment and procedures used in <br /> maintaining/cleaning and operating the respective BMPs/controls . A systematic evaluation will be incorporated <br /> into the Water Quality Monitoring Plan to gauge the overall effect of the BMP improvements on quality of <br /> water discharged through the outfall. Water samples from the outfall will be periodically collected, tested and <br /> analyzed to develop trend curves . It is estimated that pre and post construction laboratory test results with a <br /> final review report will be produced. <br /> Coordination: <br /> Copies of semiannual reports will be provided to SJRWMD, FDEP, Indian River County Public Works <br /> Division. <br /> Duration : <br /> Month 1 through Month 34 <br /> Conclusion: <br /> This Draft Performance and Water Quality Monitoring Plan is conceptual in nature and will be considerably <br /> refined based on input received from the SJRWMD , FDEP and other concerned agencies or parties . <br /> EDUCATION & BMP IMPLEMENTATION AT THE EAST GIFFORD PROJECT AREA: <br /> An effective hands-on educational program will be offered to the homeowners of East Gifford Area by <br /> employing an existing educational program, known as the Florida Yards and Neighborhood Program (FYN) , <br /> operated by University of Florida ' s Institute of Food and Agricultural Sciences (UF/IFAS) Indian River County <br /> Cooperative Extension Service . <br /> DEP Agreement No . WM836, Attachment A- 1 , Page 7 of 11 <br />