My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-322
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-322
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2016 1:34:12 PM
Creation date
9/30/2015 11:20:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
09/18/2007
Control Number
2007-322
Agenda Item Number
11.J.1
Entity Name
Post,Buckley,Schuh & Jernigan
Subject
Amendment #1 to Work Order #2 Well Hydrology Modeling
Well Field Expansions
Area
North and South RO Plants
Supplemental fields
SmeadsoftID
6614
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 <br /> Scope of Services <br /> Indian River County <br /> Department of Utility Services <br /> Professional Service Support to Address Comments of the Request for Additional Information #1 <br /> dated August 17. 2006 for CUP Application No. 10524 <br /> General <br /> PBS&J on behalf of Indian River County (IRC) submitted and application to the St. Johns River Water <br /> Management District (SJRWMD) for modification of CUP No. 10524 to increase groundwater <br /> withdrawals at the Hobart Park (HP) Water Treatment Plant (WTP) . SJRWMD requested additional <br /> information including an analysis of the drawdown and water quality changes in the Floridan and surficial <br /> aquifers due to proposed withdrawals at the North (HP) and South WTPs plus all existing legal users <br /> within five miles of the WTPs . <br /> Scope of Work <br /> PBS&J will provide professional services to respond to comments from the SJRWMD RAI letter dated <br /> August 17, 2006. In response to the questions above PBS&J will be performing work beyond the original <br /> scope of work under this assignment. The three main areas where additional work is being performed are : <br /> • the construction of groundwater withdrawal model and saltwater intrusion analysis <br /> • the addressing of demand projections based on expected population, and <br /> • the preparation of a water conservation plan. <br /> This additional scope of work outlines these efforts . <br /> Certain assumptions have been made in preparing this Scope of Work (SOW). To the extent possible, <br /> they are stated herein, and are reflected in the budget for services. If the scope of work required is <br /> different than that stated herein, the resultant changes in scope of work would serve as a basis for <br /> amending the CSA as agreed to by both IRC and PBS&J. This SOW includes preparing up to two <br /> responses to follow-up request for clarification or additional information that the District might request in <br /> the future. The tasks for this SOW are : <br /> TASK 1 : The Construction Of Groundwater Withdrawal Model And Saltwater Intrusion Analysis <br /> TASK 1 - 1 : Geographic Information System Set-up <br /> To construct a proper groundwater model that best represents "real world" conditions PBS&J proposes to <br /> use Geographic Information System (GIS) based on data from definitive studies within the modeled <br /> region. PBS&J proposes to compile available data on aquifer characteristics and existing legal uses into a <br /> GIS from the following sources : <br /> • US Geological Survey (USGS); <br /> • Florida Geological Survey (FGS); <br /> • SJRWMD; and <br /> • Readily available reports from previous consultants. <br /> The GIS will be used in Task 1 -2 and 1 -8. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.