My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-389
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-389
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 11:27:41 AM
Creation date
9/30/2015 11:27:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
11/13/2007
Control Number
2007-389
Agenda Item Number
11.J.1
Entity Name
Schulke,Bittle & Stoddard LLC
Subject
Vero Lake Estates Master Water Main Project
Amendment No.1 to Work Order No.4
Area
Vero Lakes Estates
Supplemental fields
SmeadsoftID
6685
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 2 <br /> (Fee Schedule) <br /> Method and Amount of Compensation <br /> Schulke, Bittle & Stoddard, L.L.C . , proposes to provide the Scope of Work based on the following lump sum fees : <br /> Amendment <br /> Original Fee No. l Addition Total <br /> Task 1 . Surveying and preparation of Base Plans $39,300 . 00 $2,300 .00 $41 ,600 . 00 <br /> (Note: Surveying will include establishment <br /> of a corridor for the proposed pipeline and plan <br /> and stationing of the corridor, location of <br /> improvements and topography within the corridor.) <br /> Task 2 . Engineering design, preparation of Construction $78,000.00 $5 ,655 . 00 $83 ,655 . 00 <br /> Plans, Hydraulic analysis/model of the Master <br /> Planned 12" Water Main and future water main <br /> grid/network in Vero Lake Estates, Geotechnical <br /> report (soil borings- 1 / 750 ft + along route), <br /> preparation and submittal of Permitting <br /> Applications, and preparation of Specifications <br /> and Bid Documents utilizing Standard IRC Bid <br /> Documents . Forms, Documents and Drawings <br /> will be in electronic Format MS Word. <br /> Task 3 . Assistance during Bidding, Bid Evaluations. $37,000 .00 $21640 . 00 $391640 . 00 <br /> Contract Award and Construction Administration <br /> and Periodic Administration and Periodic <br /> Construction/Field inspections. <br /> Printing and Reproduction <br /> The County shall make direct payment to our office for the cost of printing project plan sheets required for utility <br /> coordination and for copies of reports, drawings, specifications, bidding and construction contract documents, and other <br /> pertinent items required by federal, state and local agencies from whom approval of the project must be obtained, <br /> prospective bidders, material suppliers, and other interested parties, but may charge only for the actual cost of providing <br /> such copies based on the following tabulation : <br /> 8 1 /2" x l l " $ 0 .25/sheet Blue line prints $ 0 .333/SF <br /> 11 " x 17" $ 0. 50/sheet Reproducible sepias $ 0 . 75 /SF <br /> 31 /2 " diskette $ 2 . 00/each Reproducible mylars $ 1 . 00/SF <br /> CD $ 4 . 00/each <br /> Application Fees <br /> The county shall make direct payment to our office for the actual cost of all construction permit application fees paid to <br /> jurisdictional agencies, including but not limited to: <br /> F . D. E. P ., I . R.C. Engineering (Right-of- Way), I.R. F. W.C .D ., F .D. O .T, <br /> Attachment 2 <br /> Work Order No. 4 with Schulke, Bittle & Stoddard, L. L. C. <br />
The URL can be used to link to this page
Your browser does not support the video tag.