My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-339
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-339
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2016 10:07:48 AM
Creation date
9/30/2015 10:11:58 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
10/03/2006
Control Number
2006-339
Agenda Item Number
7.Q.Q.
Entity Name
Post, Buckley, Schuh and Jernigan, Inc.
Subject
Amendment No. 1 to Work Order No. 5-West region WWTF
Supplemental fields
SmeadsoftID
5881
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 <br /> Amendment No. 1 to WO No. 5 <br /> Scope of Services <br /> Indian River County <br /> Department of Utility Services <br /> Additional Design Services for the West Region WWTF <br /> General <br /> PBS&J has been providing design services on the West Region WWTF for Indian River County Department of Utility <br /> Services (the County). During the course of the design, additional design services have been requested by the <br /> County. PBS&J would provide the additional design and associated construction services (shop drawing reviews, <br /> RFI , site visits) according to the following scope of services with County staff's written approval . <br /> Scope of Work <br /> The scope of services shall include the following additional items , <br /> 1 . Provide covers over the two new clarifier weirs for algae growth control and leave the manual chlorine feed <br /> system as a back-up as designed. <br /> 2 , Provide channel velocity and level measurement provisions to calculate feed flow to the chlorine contact <br /> tank and incorporate this flow signal in the chlorine feed pacing loop. <br /> 3. Demolish existing hydropneumatic tank system and design a new 20,000-gallon hydropneumatic tank <br /> system. The tank shall be located across the street from the original location and the compressor and <br /> compressor control panel will be located in the existing chlorine storage area on the wall . <br /> 4 . Provide new diffuser system for the two existing sludge holding tanks . <br /> 5. Provide covers for the two existing sludge holding tanks. <br /> 6 . Provide chemical scrubber type odor control system (similar to South County digester odor control system) <br /> for the two existing sludge holding tanks. No new building is anticipated or included in the design for the <br /> odor control equipment. <br /> Schedule <br /> The work outlined above will be completed in conjunction to the Design of the West Region WWTF and <br /> will add six (6) weeks to the final bid documents submittal from the date of written authorization to <br /> proceed with the design . <br /> Compensation <br /> Compensation for the additional structural , mechanical and electrical design and construction services associated <br /> with this amendment will be by Lump Sum method for each task as authorized in writing by County staff. <br /> Design Services $53,200 Lump Sum <br /> Construction Services $ 8 ,200 Lump Sum <br /> TOTAL $61 ,400 Lump Sum <br /> Page 1 of 1 <br /> ry <br /> F-N\ilivicsW T1GTY - EMPLOYEE FOLDERS\Lary Broxm\PB58U Admcndmrnt 1 10 WO NS.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.