My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-076
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2016 12:50:44 PM
Creation date
9/30/2015 10:37:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
02/20/2007
Control Number
2007-076
Agenda Item Number
11.J.2
Entity Name
Camp Dresser and McKee,Inc.
Subject
North County Water Treatment Plant Expansion
Amendent No. 1 to Work Order No. 6
Area
North County Water Treatment Plant
Supplemental fields
SmeadsoftID
6194
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. Consulting Engineer Insurance Requirements <br /> A. Workers Compensation as required by the State of Florida. Employer's Liability of <br /> $100,000 each accident, $500,000 disease policy limit, and $100,000 disease each <br /> employee. <br /> B. General Liability: commercial general liability coverage, including contractual <br /> liability and independent contractor, with a minimum combined single limit of <br /> $100,000 per occurrence and personal injury coverage of $50,000. <br /> C. Business Automobile Liability : owned, hired, and non-owned vehicles at a <br /> minimum combined single limit of $100,000 per occurrence and personal injury <br /> coverage of $50,000 for bodily injury and property damage for owned and non- <br /> owned vehicles. <br /> D. Professional Liability Insurance: providing coverage for negligent acts, errors, or <br /> omissions committed by Consultant with a limit of $1,000,000 per claim/ annual <br /> aggregate. This insurance shall extend coverage to loss of interest, earning, profit, <br /> use, and business interruption, cost of replacement power, and other special, <br /> indirect, and consequential damages. <br /> IV. Compensation for Services <br /> The additional expense associated with reconfiguring the wellheads to allow for <br /> sampling and the increased frequency have added to the previously anticipated project <br /> cost. The original work order consisted of 20 hours of labor per month for sampling and <br /> reporting for a total of 480 hours. After beginning the sampling process, it was <br /> determined that all wells could be sampled in a 4-hour period, rather than a full 8-hour <br /> day. Increasing the number of sampling events from 24 to 104 is expected to increase the <br /> number of hours required from 480 to 896. A summary of the hours/budget in the <br /> original proposal, as well as the amended amounts to account for the modified scope of <br /> services is provided in Table 1. The additional cost incurred from reconfiguring the <br /> wellheads was approximately $750 for time and materials. The budgeted other direct <br /> costs did not include provisions for purchasing pressure gauges, sampling taps, fittings, <br /> etc. The total requested increase in the upper limit under this amendment is $46,510. <br /> Compensation is to be paid on a billing rate basis plus other direct costs on an as-needed <br /> basis. CDM will submit monthly invoices for services performed. <br /> 2 jb1091 do <br />
The URL can be used to link to this page
Your browser does not support the video tag.