My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-371
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-371
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2016 11:42:02 AM
Creation date
9/30/2015 9:25:32 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
11/15/2005
Control Number
2005-371
Agenda Item Number
7.H.
Entity Name
Kimley-Horn
Subject
Intersection Improvements
Area
58th Ave. and SR 60
Supplemental fields
SmeadsoftID
5277
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "A" <br /> INDIAN RIVER COUNTY <br /> RIGHT OF WAY MAP CHECKLIST <br /> All Right-of--way projects shall adhere to Chapter 177 & 472 , F. S . and <br /> Chapter 61G17, F.A. C . as minimum and be certified as such . <br /> 1 . Cover sheet/Key sheet . <br /> 2 . Survey notes and report sheet (As applicable) <br /> 3 . Survey Control sheet (As applicable and or necessary) <br /> 4 . Subsequent R/W map sheets . <br /> 5 . Supply a Box or area for county acceptance and/or certification . <br /> 6 . Title Box of each sheet must contain : <br /> a. County <br /> b . State Road Number <br /> c . Designed, drawn and checked by (use names or initials) & date <br /> d . Scale <br /> e . Field Book References <br /> f. Sheet Numbers to be in numerical order ( 1 , 2 , 3 , 4, etc . ) NOT ( 1 , lA, 1B , <br /> 2 , etc . ) <br /> 7 . Any notes necessary to set out the type and/or purpose of the map shall be shown. <br /> 8 . Show pertinent dimensions and bearings in the following fashion as the case may <br /> be : <br /> a. Plat — (P) <br /> b . Computed — (C) <br /> c . Field — (F) <br /> d. Deed (D) <br /> 9 . Table of Ownerships shall show : <br /> a. Parcel Number <br /> b . Owners Name <br /> c . Recording Data <br /> 10 . Show stations and offsets to all Right of Way Breaks . <br /> 11 . Show monumented baselines and all references thereto . <br /> 12 . Verify that computed distances and bearings are supported by field <br /> measurements . <br /> 13 . Verify and monument significant elements of Baseline alignment shown . <br /> (i . e. curves , bearings and P . I. Stations) <br /> 14 . Ensure that significant elements of all curves are shown and are correct . Also <br /> show curve data on all sheets where they appear. <br /> 15 . Begin and End R/W Project with Stations . <br /> 16 . Stationing in field minimum 500 ' beyond beginning and ending of project. <br /> 17 . Baseline (equate to intersecting State or County Jobs by Station and job number <br /> when available) as available . <br /> 18 . Projects shall be in NAD83 /90 State plane coordinate system and bearings <br /> reference shall be shown and must be clearly stated . Values shall be place on key <br /> baseline monumentation . <br /> 19 . County/State lines <br /> 20 . Section <br /> 21 . Township <br />
The URL can be used to link to this page
Your browser does not support the video tag.