My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-106
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 2:03:17 PM
Creation date
9/30/2015 9:37:20 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
04/04/2006
Control Number
2006-106
Agenda Item Number
7.O.
Entity Name
Florida Dept of Environmental Protection
Subject
Amendement No. 2-Agreement No. H51R1, 2004 hurricane recovery plan
dune restoration project
Supplemental fields
SmeadsoftID
5569
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A-1 <br /> PROJECT WORK PLAN <br /> INDIAN RIVER COUNTY DUNE RESTORATION PROJECT <br /> The PROJECT consists of dune restoration at North Indian River County (R17-R70), Vero Beach (R70-R86), South <br /> Indian River County (RI00-R107), and beach restoration activities along the segment of shoreline known as Sector 7 <br /> (95ft. north of T- 100 — 105ft. south of R- 107). The parties expressly agree that the provisions of this paragraph shall <br /> survive and be enforceable beyond the expiration of this Agreement. The PROJECT shall be conducted in accordance <br /> with the terms and conditions set forth under this Agreement, all applicable DEP permits and the eligible project task <br /> items established below. All data collection and processing, and the resulting product deliverables, shall comply with the <br /> standard technical specifications contained in the Department' s Regional Data Collection and Processing Plan and <br /> Geographic Information System Plan, unless otherwise specified in the approved Scope of Work for an eligible PROJECT <br /> item. These plans may be found at http://www.del).state.fl .us/beaches/. Three (3) originals on all written reports <br /> developed under this Agreement shall be forwarded to the Department, unless otherwise specified. <br /> Task No : Eligible Project Item: <br /> 2.0 Dune Restoration <br /> Work performed and costs incurred associated with the design, permitting and placement of fill material and <br /> installation of vegetation within the project area. Eligible costs may include mobilization, demobilization, <br /> construction observation or inspection services, beach fill, dune stabilization measures and native beach-dune <br /> vegetation. Construction shall be conducted in accordance with any and all permits issued by the Department. <br /> 3.0 Sand Placement <br /> 3. 1 Sector 7 Beach Restoration <br /> Professional services required for engineering and design, obtaining environmental permits and other <br /> authorizations and the preparation of plans and specifications. This item specifically excludes permit <br /> application fees or any other fees paid to the State of Florida. <br /> Work performed and costs incurred associated with the placement of fill material and/or the construction of <br /> erosion control structures within the project area. Eligible costs may include mobilization, demobilization, <br /> construction observation or inspection services, beach fill , tilling and scarp removal , erosion control <br /> structures, dune stabilization measures and native beach-dune vegetation. Construction shall be conducted in <br /> accordance with any and all permits issued by the Department. <br /> A monitoring program conducted in accordance with the requirements specified in any and all permits issued <br /> by the Department and the US Army Corps of Engineers. A monitoring plan must be submitted and approved <br /> in writing by the Department prior to the initiation of monitoring activities. The plan shall be developed in a <br /> manner which will coordinate the monitoring activities associated with current shoreline stabilization projects <br /> located within or adjacent to the project area and with the Department' s Regional Coastal Monitoring <br /> Program. <br /> REMAINDER OF PAGE INTENTIONALLY LEFT BLANK <br /> Attachment A- 1 , DEP Agreement No. H51R1 , Amendment No. 2, Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.