My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-042
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2016 10:51:15 AM
Creation date
9/30/2015 9:30:30 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County, Amendment No. 2 <br /> 66th Avenue/ County Road 510 Roadway <br /> Widening <br /> Roadway Design/ Construction Documents $371 ,020 <br /> Stormwater Design and Permitting $ 115 ,065 <br /> Structure and Bridge Plans $ 116 250 <br /> Utility Coordination $ 10,005 <br /> Stormwater Pollution Prevention Plan $271205 <br /> Signalization Design $ 15 ,975 <br /> Hourly Not-to-Exceed Tasks <br /> Stormwater Facilities Topographic Surveys $ 37,500 <br /> Stormwater Facilities Geotechnical Investigation $ 10,500 <br /> "SECTION XVI — DURATION OF AGREEMENT" is being modified to incorporate the <br /> following : <br /> The time for completion of the 90% design drawings and permit applications for the <br /> scope of services detailed in this amendment will be eighteen ( 18) months following <br /> receipt of the notice to proceed from the COUNTY. Once permits and 90% design <br /> comments are received from the COUNTY, 100% design drawings will be completed 60 <br /> days thereafter. <br /> Page 10 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.