Laserfiche WebLink
INTERSECTION IMPROVEMENTS AT <br /> CR-510 AND US HIGHWAY 1 <br /> AMENDMENT NO. 2 TO THE PROFESSIONAL CIVIL ENGINEERING <br /> GEOTECHNICAL ENGINEERING & LAND SURVEYING SERVICES AGREEMENT <br /> BETWEEN McMAHON ASSOCIATES, INC. & INDIAN RIVER COUNTY, FLORIDA <br /> This is an amendment to the existing Professional Civil Engineering, Geotechnical Engineering and Land <br /> Surveying Services Agreement (AGREEMENT) dated May 17, 2005, between McMahon Associates, Inc. <br /> (ENGINEER) and Indian River County (COUNTY). This amendment addresses changes in "Section I — Project <br /> Limits and Description," "Section III — Scope of Services," "Section IV — Time for Completion," "Section V — <br /> Compensation," and "Section VIII — Extra Work" of this AGREEMENT. <br /> "SECTION I - PROJECT LIMITS AND DESCRIPTION" is being modified to incorporate the following: <br /> Consultant services are required for the preparation of supplemental design survey, roadway design plans <br /> with the design of improvements within the present contract limits of the intersection of SR-5/US- I and CR-510 <br /> (Wabasso Road), in Indian River County, Florida, as amended on February 7, 2006. The roadway improvements <br /> identified by the COUNTY consist of the following: <br /> "SECTION III - SCOPE OF SERVICES" is being modified to incorporate the following: <br /> The ENGINEER agrees to perform professional roadway design and related services in connection with the <br /> project, as required and set forth in the following: <br /> B. Design Survey <br /> The ENGINEER shall provide supplemental design survey services necessary to support and <br /> facilitate contemplated design and permitting activities associated with this supplemental portion <br /> of the project. Additional subsurface utility locating is included. <br /> 1 . Establish a project wide Horizontal Control Network within the DESIGN LIMITS . <br /> a. Existing horizontal control, as established per the original agreement, dated May 17, 2005 <br /> and Amendment No. I , will be supplemented to complete the design survey effort as <br /> identified in this amendment (number 2), and as reviewed by the COUNTY, dated May <br /> 21 , 2007. <br /> 2. Establish a project wide Vertical Control Network within the DESIGN LIMITS. <br /> a. Existing vertical control, as established per the original agreement, dated May 17, 2005 <br /> and Amendment No. 1 , will be supplemented to complete the design survey effort as <br />