Laserfiche WebLink
. 1 Programming Architect <br /> . 2 Land Survey Services Owner <br /> . 3 Geotechnical Services Not Provided How about borings we already have? <br /> .4 Space Schematics/Flow Diagrams Architect <br /> . 5 Existing Facilities Surveys Not Provided <br /> . 6 Economic Feasibility Studies Not Provided <br /> . 7 Site Analysis and Selection Owner <br /> . 8 Environmental Studies and Reports Owner <br /> . 9 Owner-Supplied Data Coordination Architect <br /> . 10 Schedule Development and Monitoring Architect <br /> . 11 Civil Design Architect <br /> . 12 Landscape Design Architect <br /> . 13 Interior Design Not Provided <br /> . 14 Special Bidding or Negotiation Not Provided <br /> . 15 Value Analysis Architect <br /> . 16 Detailed Cost Estimating Not Provided <br /> . 17 On-Site Project Representation Owner <br /> . 18 Construction Management Owner <br /> . 19 Start-up Assistance Architect <br /> . 20 Record Drawings Architect <br /> . 21 Post-Contract Evaluation Architect <br /> . 22 Tenant-Related Services Not Provided <br /> . 23 Signage Architect <br /> . 24 Fire Protection Not Provided <br /> .25 Security System Owner <br /> . 26 Indian River County Site Plan Architect <br /> Approval Preparation <br /> . 27 Demolition Documents Not Provided <br /> . 28 Rezonine Owner <br /> . 29 Information Technology System Backbone Architect <br /> Additional information regarding the above enumerated items : <br /> NONE <br /> All terms and conditions shall remain the same as in the "PRIMARY CONTRACT" except as noted <br /> herein. <br /> Page 5 of 5 <br />