My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-447
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-447
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2016 2:23:00 PM
Creation date
9/30/2015 11:34:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
12/18/2007
Control Number
2007-447
Agenda Item Number
11.J.1
Entity Name
Post, Buckley, Schuh & Jernigan
Subject
Amendment No.2 to Work Order No.2 Installation Production Wells
Area
North Water Treatment Facility
Supplemental fields
SmeadsoftID
6768
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 1 .2 — Prepare CUP Application Amendment <br /> PBS &J will prepare the information to amend the existing CUP application to include the three new <br /> production wells with assistance from the County. The necessary data and information regarding the <br /> three additional wells and the results of the updated modeling efforts will be submitted as part of the <br /> response to the Request for Additional Information in order to effect the amendment of the <br /> application. This scope of services does not include services for responding to requests for additional <br /> information from the SJRWMD. <br /> Task 2 — Well Design and Construction <br /> Task 2. 1 — Well Design <br /> PBS&J will revise the current set of technical specifications that were used in the contract document <br /> for bidding the three new production wells in the North wellfield included in the CUP application . <br /> The specifications will address the materials to be used, estimate quantities , general drilling method, <br /> reporting requirements, and hydrogeologic testing program to be completed during construction of <br /> the three supply wells. Specifications will be prepared in a suitable format for solicitation of bids <br /> from qualified contractors. It is assumed that the technical specifications that were used for the first <br /> three new wells are largely sufficient for the proposed additional three wells . A draft copy of the <br /> technical specifications and Bid Tabulation sheet will be provided to the County for review and <br /> comment. PBS&J will provide to the County, one final hard copy and one electronic copy, in <br /> Microsoft Word and Excel. The County will provide front-end documents to complete the bid <br /> package . <br /> Task 2 .2 — Bidding Assistance <br /> PBS&J will assemble, print and distribute bid sets . PBS&J will provide an estimate of the probable <br /> cost of well construction and will assist the County in the selection of the best-qualified contractor. <br /> PBS&J will attend one pre-bid meeting and provide answers to technical questions posed. Up to one <br /> Addendum will be prepared. PBS&J will review bid submittals for completeness and compliance <br /> with the bidding instructions and contract requirements and will make a recommendation for award, <br /> to the County. <br /> Task 2 .3 — Construction Administration <br /> PBS&J shall provide administrative services during the construction and testing of the three <br /> production wells . These services shall include schedule coordination with the Drilling Contractor, <br /> maintaining a daily log of well construction and testing activities, recording materials used during <br /> construction, recording and approving Contractor submittals, and review of Contractor pay requests. <br /> PBS&J will provide the County a weekly project summary report via electronic mail during <br /> construction that details daily construction and testing activities . <br /> Task 2.4 — Hydrogeologic Services <br /> For each of the three wells, day to day well construction observation through installation of the final <br /> casing will be performed by the County. PBS&J will develop well construction specifications with <br /> this understanding to minimize the need for hydrogeologic observation by the Engineer. For each of <br /> the three wells, after the final casing has been installed to an estimated depth of 360 feet, PBS&J will <br /> CAF'bw/X aEnvimnmenla]INDIAN RIVER_COAIRC_W WW2004',W002_CUP-Wells'L I_PmpasalsV lA Proposals\3 new wells SOWAttnchment l II1607Joe <br /> Lnm Revised 1126,'2007 1 28 PM <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.