Laserfiche WebLink
Indian River County, Amendment No. 2 <br /> ` Roadway Improvements to State Road AIA <br /> and County Road 510 <br /> • COUNTY representatives will be on site during construction and responsible for <br /> construction observation . <br /> • Conduct review of implemented maintenance of traffic devices . <br /> • Conduct the weekly progress meetings. <br /> • Work with the Contractor to develop and process monthly pay request. <br /> • Provide monitoring of the utility improvements associated with the bridge-culvert <br /> construction. <br /> "SECTION III — SCOPE OF SERVICES " is being modified to incorporate the following: <br /> The ENGINEER will provide limited construction services assistance for roadway, and <br /> utility construction elements of the Roadway Improvements to State Road AIA and <br /> County Road 510 Projects. The following provides descriptions of the tasks that the <br /> ENGINEER will perform. The general scope of work will be conducted under a lump <br /> sum budget. However, should the COUNTY request additional services other than those <br /> described below, assistance may be authorized under an hourly budget. <br /> Roadway Construction Observation Assistance <br /> • The ENGINEER will attend the Pre-Bid and Pre-Construction meetings and address <br /> the questions that pertain to the ten various roadway improvement projects. <br /> • The ENGINEER will attend the bi-weekly progress meetings for up to 52 weeks. <br /> • The ENGINEER will respond to COUNTY and Contractor Requests for Information <br /> (RFI) . <br /> • The ENGINEER will assist the COUNTY in acquiring various License Agreements <br /> located along State Road AIA corridor. <br /> • The ENGINEER will review the contractor submitted shop drawings. <br /> • The ENGINEER will review as-built drawings provided by the Contractor' s licensed <br /> surveyor. <br /> • The ENGINEER will assist the COUNTY in conducting two, walk through <br /> inspections . One inspection as a final inspection and a second inspection as a follow <br /> up to clear punch list items for each of the ten projects . <br /> • When requested by the COUNTY, the ENGINEER will review Contractor proposed <br /> Page 2 of 5 <br />