Laserfiche WebLink
ATTACHMENT A <br />Project Description <br />CDM will provide additional engineering services for permitting to expand the capacity <br />of the North County Water Treatment Plant to full build -out. Work Authorization No.1 <br />was to provide engineering services related to the preliminary design, final design, <br />permitting and construction services to increase the permeate capacity of the plant from <br />3.0 million gallons per day (mgd) to 7.5 mgd, which was increased to 12 mgd in <br />Amendment 1. This amendment is for additional engineering services for permitting to <br />finalize the permits necessary for construction and contract document preparation. <br />it. Scope of Services <br />Engineering permitting services to expand the capacity of the North County Water <br />Treatment Plant are provided in Part B of Attachment A. <br />III. Consulting Engineer Insurance Requirements <br />A. Workers Compensation as required by the State of Florida. Employer's Liability of <br />$100,000 each accident, $500,000 disease policy limit, and $100,000 disease each <br />employee. <br />B. General Liability: commercial general liability coverage, including contractual <br />liability and independent contractor, with a minimum combined single limit of <br />$100,000 per occurrence and personal injury coverage of$50,000. <br />C. Business Automobile Liability: owned, hired, and non -owned vehicles at a <br />minimum combined single limit of $100,000 per occurrence and personal injury <br />coverage of $50,000 for bodily injury and property damage for owned and non - <br />owned vehicles. <br />D. Professional Liability Insurance: providing coverage for negligent acts, errors, or <br />omissions committed by Consultant with a limit of $1,000,000 per claim/annual <br />aggregate. This insurance shall extend coverage to loss of interest, earning, profit, <br />use, and business interruption, cost of replacement power, and other special, <br />indirect, and consequential damages. <br />IV. Compensation for Services <br />North County WTP - Phase II Build -Out Expansion Services <br />Task 1 <br />- Updating of Preliminary Design <br />N/ C <br />Lump Sum <br />Task 2 <br />- Preparation of Contract Documents <br />$3,800 <br />Lump Sum <br />Task 3 <br />- Permitting Services <br />$15,790 <br />Upper Limit <br />Task 4 <br />- Bidding Assistance <br />N/C <br />Upper Limit <br />Task 5 <br />- Contract Administration/ Periodic Field Representation <br />N/C <br />Upper Limit <br />Total <br />$19590 <br />Compensation is to be paid on a billing rate basis plus other direct costs on an as -needed <br />basis. CDM will submit monthly invoices for services performed. <br />A-2 mn2405.aoo <br />