Laserfiche WebLink
Services not included in this scope of services are listed as follows: <br /> Y Title Work or Research of Public Records for Determination of the existence of easements or <br /> rights-of-way along the route of the proposed sewer force main. <br /> • Excavation for Feld verification of actual locations of existing underground utilities and <br /> structures. It is requested that Indian River County provide the excavation as directed by <br /> Schulke, Bittle & Stoddard, L. L.C . <br /> Y Any services in connection with the project not otherwise provided for in this scope of <br /> services. <br /> Description of Amendment <br /> SBS has been directed to stop work, and provide a change order and revised scope of work for <br /> changes generally described as follows: <br /> 1 . Force main route has been changed. Design and survey work is complete, approved and <br /> permitted and includes 2 '/z miles of force main. Contract documents have been prepared and <br /> the project has been publicly bid. The design included a connection to an existing 24-inch <br /> force main on the south side of I.R.F.W.C .D. Canal ` D'/4d' St. However, due to a pending <br /> public works bridge construction project at 82"d Ave. and 4d' St., the connection can not be <br /> made without causing a conflict with the proposed bridge alignment. Road right-of-way and <br /> construction constraints prohibit an alternate suitable connection at this location. Therefore, it <br /> has been determined that the force main should be constructed to extend west approximately <br /> '/4mile along the north side of the I .R.F.W.C .D. Canal `D' right-of-way to the West Regional <br /> Wastewater Treatment Plant Site where a direct connection to the treatment plant can be <br /> made. The change in the route is generally described as: <br /> From : 16" Street/74 " Avenue, south on 74d' Avenue ( 12" main), west on 12th Street ( 12" <br /> main), south on 82nd Avenue ( 12" main) to 8d' Street, and south on 82"d Avenue (24" <br /> main) to 82nd Avenue/4d' Street. <br /> To: 16d' Street/74 " Avenue, south on 74d' Avenue ( 12" main), west on 12th Street ( 12" <br /> main), south on 82nd Avenue ( 12" main) to 8d' Street and south on 82nd Ave. (24-inch <br /> main) to I.R.F.W.C.D. Canal `D' (north of 4h St.) and west along I. R.F. W.C.D. <br /> Canal ` D' right-of-way to the south side of the I .R.C. West Regional Wastewater <br /> Treatment Plant site, and north-westerly into the plant site to a connection to the <br /> plant. <br /> 2. Changes to the contract will entail: <br /> Task 1 <br /> • /4 mile new route survey along I .R.F.W.C.D. Canal `D' west of 82"d Avenue, and <br /> onto the West Regional Wastewater Treatment Plant site. <br /> Task 2 <br /> • /4 mile of new route design work, geotechnical report, preparation and submittal of <br /> permit application, and preparation of specification and bid documents for the new '/4 <br /> mile force main. <br /> Task 3 <br /> • Assistance during bidding, bid evaluations, contract award, construction <br /> administration and field inspections. <br />