My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-218
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2016 4:46:47 PM
Creation date
9/30/2015 9:49:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
06/13/2006
Control Number
2006-218
Agenda Item Number
11.J.2.
Entity Name
Schulke, Bittle and Stoddard, LLC
Subject
Amendment No. 2-74th. Avenue Force Main
Supplemental fields
SmeadsoftID
5692
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 2 - FEE SCHEDULE <br /> Method and Amount of Compensation <br /> Schulke, Bittle & Stoddard, L.L.C ., proposes to provide the above Scope of Services based <br /> on the following lump sum fees: <br /> Amendment Amendment <br /> No . I No .2 <br /> Task 1 . Original Fee Additional Additional Total <br /> Surveying and preparation of Base Plans $27,475 .00 $ 18,500.00 $6,000.00 $51 ,975 .00 <br /> (Note : Surveying will include establishment <br /> of a corridor for the proposed pipeline and plan <br /> and profile of the corridor.) Includes additional <br /> cost of survey for new location of force main. <br /> Task 2. <br /> Engineering`design, preparation of Construction $68,310.00 $ 12,295 . 80 $ 5 ,000. 00 $85,605 . 80 <br /> Plans, Geotechnical report <br /> (soil borings- 1 / 750 ft + along route), <br /> preparation and submittal of Permitting <br /> Applications, and preparation of Specifications <br /> and Bid Documents utilizing Standard IRC Bid <br /> Documents. Forms, Documents and Drawings <br /> will be in electronic Format MS Word. Additional <br /> cost of engineering for new location of force main. <br /> Task 3 . <br /> Assistance during Bidding, Bid Evaluations, $35,995 .00 $0.00 $3 ,200.00 $39, 195 .00 <br /> Contract Award and Construction Administration, <br /> and Periodic Administration and Periodic <br /> Construction/Field inspections. No cost change. <br /> TOTALS $ 1319780.00 $30,795 . 80 $ 14200.00 $ 176, 775 .80 <br /> Printing and Reproduction <br /> The County shall make direct payment to our office for the cost of printing project plan sheets required for <br /> utility coordination and for copies of reports, drawings, specifications, bidding and construction contract <br /> documents, and other pertinent items required by federal, state and local agencies from whom approval of the <br /> project must be obtained, prospective bidders, material suppliers, and other interested parties, but may charge <br /> only for the actual cost of providing such copies based on the following tabulation: <br /> 8 1 /2 " x 11 " $ 0.25/sheet blue line prints $ 0.333/SF <br /> 11 " x 17" $ 0.50/sheet reproducible sepias $ 0.75/SF <br /> 31 /2 " diskette $ 2.00/each reproducible mylars $ 1 . 00/SF <br /> CD $ 4.00/each <br />
The URL can be used to link to this page
Your browser does not support the video tag.