Laserfiche WebLink
ATTACHMENT <br /> INDIAN RIVER UTILITIES DEPARTMENT <br /> NORTH COUNTY BRINE DISPOSAL <br /> PROJECT SCHEDULE <br /> An estimated schedule for completion for the scope of services contained in Amendment 2 is shown <br /> below. The time needed to complete each of the tasks described in Attachment 1 by Ecotech <br /> Consultants, Inc . and the County can be reasonably estimated as shown below with the limitation <br /> that neither the County nor Ecotech Consultants, Inc. can control the phase of the permitting process <br /> controlled by the Florida Department of Environmental Protection, the St . Johns River Water <br /> Management District, or the U. S . Army Corps of Engineers . <br /> Milestone Estimated Completion Date <br /> FDEP Tallahassee Presentation 15 September 2006 <br /> Investigate ERP Optional Design 30 September 2006 <br /> ERP Lost Tree Conceptual Design 15 September 2006 <br /> IWP/ERP Meetings 31 October 2006 <br /> ERP Lost Tree Plan 30 September 2006 <br /> ERP RAI Response 30 September 2006 <br /> IWP RAI Response 30 September 2006 <br /> Engineering Services 30 September 2006 <br /> Page 6 of 6 <br />