My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-310
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-310
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2016 3:49:16 PM
Creation date
9/30/2015 10:01:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
09/12/2006
Control Number
2006-310
Agenda Item Number
11.J.3.
Entity Name
Camp Dresser & McKee, Inc.
Subject
North County Water Treatment Plant-Amendment No.3 - Work Order No.1
Supplemental fields
SmeadsoftID
5815
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br /> SCOPE OF WORK SUMMARY <br /> 1. Project Description <br /> CDM will provide additional engineering services for permitting to expand the capacity <br /> of the North County Water Treatment Plant to full build-out. Work Authorization No. 1 <br /> was to provide engineering services related to the preliminary design, final design, <br /> permitting, and construction services to increase the permeate capacity of the plant from <br /> 3.0 million gallons per day (mgd) to 7.5 mgd, which was increased to 12 mgd in <br /> Amendment 1 . Additional Site Plan Permitting and Contract Document revisions were <br /> approved in Amendment 2. This amendment for additional engineering services for <br /> design, permitting, and bidding services to take the project services required through <br /> the Planning and Zoning Commission and bidding services to make the bidding for the <br /> Plant expansion more flexible by identifying equipment that may be added at a later <br /> date should the bids exceed the County's capital budget. <br /> II. Scope of Services <br /> Engineering permitting services to expand the capacity of the North County Water <br /> Treatment Plant are provided further in this attachment. <br /> III. Consulting Engineer Insurance Requirements <br /> A . Workers Compensation as required by the State of Florida . Employer's Liability of <br /> $100,000 each accident, $500,000 disease policy limit, and $100,000 disease each <br /> employee. <br /> B. General Liability: commercial general liability coverage, including contractual <br /> liability and independent contractor, with a minimum combined single limit of <br /> $100,000 per occurrence and personal injury coverage of $50,000. <br /> C. Business Automobile Liability: owned, hired, and non-owned vehicles at a <br /> minimum combined single limit of $100,000 per occurrence and personal injury <br /> coverage of $50,000 for bodily injury and property damage for owned and non- <br /> owned vehicles. <br /> D. Professional Liability Insurance: providing coverage for negligent acts, errors, or <br /> omissions committed by Consultant with a limit of $1,000,000 per claim/ annual <br /> aggregate. This insurance shall extend coverage to loss of interest, earning, profit, <br /> use, and business interruption, cost of replacement power, and other special, <br /> indirect, and consequential damages. <br /> IV. Compensation for Services <br /> North County WTP - Phase II Build-Out Expansion Services <br /> Task 1 - Updating of Preliminary Design N/ C Lump Sum <br /> Task 2 - Preparation of Contract Documents $20,900 Lump Sum <br /> Task 3 - Permitting Services $2,700 Upper Limit <br /> Task 4 - Bidding Assistance $8,600 Lump Sum <br /> Task 5 - Contract Administration/ Periodic Field Representation N/ C Upper Limit <br /> Total $32,200 <br /> Compensation is to be paid on a billing rate basis plus other direct costs on an as-needed <br /> basis. CDM will submit monthly invoices for services performed. <br /> A-1 mhzszs.aoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.