My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-351
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-351
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2016 1:18:27 PM
Creation date
9/30/2015 11:22:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Third Amendment
Approved Date
10/16/2007
Control Number
2007-351
Agenda Item Number
7.G.
Entity Name
McMahon Associates,Inc.
Subject
Amendment No.3 Intersection Improvements
Area
CR-510 and US Highway 1
Supplemental fields
SmeadsoftID
6645
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERSECTION IMPROVEMENTS AT <br /> CR-510 AND US HIGHWAY 1 <br /> AMENDMENT NO. 3 TO THE PROFESSIONAL CIVIL ENGINEERING <br /> GEOTECHNICAL ENGINEERING & LAND SURVEYING SERVICES AGREEMENT <br /> BETWEEN McMAHON ASSOCIATES, INC. & INDIAN RIVER COUNTY, FLORIDA <br /> This is an amendment to the existing Professional Civil Engineering, Geotechnical Engineering and Land <br /> Surveying Services Agreement (AGREEMENT) dated May 17, 2005, between McMahon Associates, Inc. <br /> (ENGINEER) and Indian River County (COUNTY). This amendment addresses changes in "Section I — Project <br /> Limits and Description', "Section III — Scope of Services", " Section IV — Time for Completion," and "Section V — <br /> Compensation," of this AGREEMENT. <br /> "SECTION I - PROJECT LIMITS AND DESCRIPTION" is being modified to incorporate the following: <br /> Consultant services are required for the preparation of construction plans and permit applications for the <br /> construction of a 16-inch diameter reuse water main on CR-510, from just east of 61 ' Drive to 58`h Avenue and <br /> south on 58th Avenue; and for the preparation of property and topography surveys required for project drainage pond <br /> sites, along the project corridor, as follows: <br /> The plans will detail the construction of the reuse water main improvements along CR-510 and along 58" <br /> Avenue, as follows: <br /> a) Design the horizontal and vertical location of approximately 2,398 LF of 16-inch <br /> diameter reclaimed water main from Station 281 +26.74 (starting station on plans) and <br /> ending at Station 305+24.60 (intersection of 58" Ave.) along CR-510 (Wabasso Road). <br /> b) Design the horizontal and vertical location of approximately 1 ,700 LF of 12-inch <br /> diameter reclaimed water main from Station 204+40 and ending at Station 221 +00 <br /> (intersection of CR-510) along 58" Ave. (Kings Highway). <br /> c) Design sub-outs on both sides of the roadway (CR-510 : 8, 132 LF; 58" Ave: 1 ,660) LF <br /> for the following utilities: <br /> i. 8-inch stub-outs for the newly proposed 16-inch and 12-inch reclaimed water mains. <br /> ii. 8-inch stub-outs for existing water mains. <br /> iii. 6-inch stub-outs for existing sanitary sewer force mains. <br /> d) Locate existing subsurface utilities at conflict points with proposed storm sewer facilities, <br /> proposed signalization mast arms, proposed reclaimed water main and proposed stub-outs <br /> for reclaimed water, potable water and sanitary sewer force main. <br />
The URL can be used to link to this page
Your browser does not support the video tag.