Laserfiche WebLink
"SECTION V — COMPENSATION" is being modified to incorporate the following: <br /> The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered pursuant to this <br /> Agreement fees in accordance with the following: <br /> A. Professional Services Fee <br /> 1 . The basic compensation mutually agreed upon by the ENGINEER and the COUNTY is <br /> as follows: <br /> Task Fee Fee <br /> Lump Sum Components Amendment 3 Total Contract <br /> Design Survey S 0.00 $ 109,924.00 <br /> Roadway Design $ 0.00 $ 246,767.00 <br /> Signing and Pavement Marking Design $ 0.00 $ 54,224.00 <br /> Traffic Signal Design $ 0.00 $ 37,825 .00 <br /> Permitting $ 0.00 $ 38,014.00 <br /> Utility Coordination $ 0.00 $ 155638.00 <br /> Landscape Plans $ 0.00 S 27,850.00 <br /> Lighting Design $ 0.00 $ 175200.00 <br /> Geotechnical Investigation $ 0.00 $ 51 , 110.00 <br /> Right of Way Maps $ 0.00 $ 845650.00 <br /> Utility Design (reuse/stub-outs) $ 65,500.00 $ 65,500.00 0� <br /> Sub-total $ 65,500.00 $ 748,702.00 <br /> Task Fee Fee <br /> Hourly Rate Components Amendment 3 Total Contract <br /> 4 lane/2 lane Roadway Transition $ 0.00 S 7,500.00 <br /> Geotechnical Investigation $ 0.00 $ 22.760.00 <br /> Retention Pond Design $ 0.00 $ 525542 .00 <br /> Landscape Details/Maintenance $ 0.00 $ 61000.00 <br /> Utility Location Survey $ 0.00 $ 12,000.00 <br /> Utility Soft-dig Location Survey $ 0.00 $ 37,350.001" <br /> (drainage design) (83 @ $450) <br /> Utility Soft-dig Location Survey $ 34,650 .00 $ 349650 .00") <br /> (reuse/stub-outs) (77 @ $450) <br /> MOT for Utility Soft-dig $ 0.00 $ 16,000.00 <br /> (8 set-ups @ $2,000) <br /> MOT for Utility Soft-dig $ 125000 .00 $ 125000.00(' ) <br /> (6 set-ups @ $2,000 ea) <br /> 8 <br />