Laserfiche WebLink
Indian River County <br /> 66th Avenue - Widening & Drainage Improvements - - - - <br /> Amendmen[ No. 4 (Mist. changes resultin from R-O-W acquisition and dividing plans into two separate packages) _ - -- -- - <br /> --- - <br /> Pee Estimate (CAI) - - - - -- <br /> 9/26/2006 -- - <br /> _ $ 140.00 $ 125 .00 $ 110.00 $85 .00 $75.00 $40.00 $57.00 <br /> Eng. I,Prin. Eng. I, P.E. Eng. IP.E. Eng. III, E.1.T. CADD Tech Clerical Inspector Subtotal Total <br /> __ - <br /> General Splitting of Plans - -- --- - -- <br /> -- - --- -General <br /> __ - _ <br /> Drawing Revisions 24 _ 40 40 $ 109800.00 <br /> __.- -- -- - 4- -- -- <br /> Separation of Quantities 8 16 _ - - ---- - _-- <br /> Sub'rotal - - - - $2,740.00 <br /> - - - - -- SUBTOTAL $133540.00 <br /> Design Modifications - <br /> " - - - ------------ - ---- <br /> - - - .-_ - <br /> Drawing Revisions 8 24 -- <br /> 32 -- - <br /> - - - $6,360.00 <br /> - -. . - <br /> Revise Quantities and Cost Estimate 2 8 16 $2,490.00 <br /> - --- <br /> _ - --- <br /> - - - -- <br /> QualityControl 2 2 2 $750.00 <br /> - - -.- <br /> Coord/Meetings/Incidentals/Printing 4 8 $ g - - — -- <br /> - - $2,980.00 <br /> IRC Review 2 2 <br /> SubTotal - __- $550.00 <br /> - --- SUBTOTAL $ 13,130.00 <br /> mi <br /> Pertting --- <br /> Modify Stormwater Calcs Report 4 44 - <br /> - 2 $ 1 ,460.00SJRWMD Permit Modification 4 2--- _ <br />_ $ 1 ,460.00 <br /> IRPWCDPermitModification 2 2 2 - $ 1 ,050.00SubTotal <br /> SUBTOTAL $3,970.00 0- - <br /> GRAND TOTAL (CAI) -- - -- - - <br /> - - - ------ - GRAND TOTAL $30,640.00 <br />