Laserfiche WebLink
Indian River County <br /> =' Emergency Operations Center Turnw <br /> ` oum" <br /> GMP Summary <br /> Allowances <br /> Report Date 26 May 06 <br /> The following sums are included as allowances in our GMP. The allowances include labor, material , unloading <br /> and taxes . In the event the actual cost of these items of work exceeds or is less than the individual allowance <br /> amount indicated, the CMP shall be increased or decreased by the difference between the actual cost and <br /> allowances, per terms of the Contract. <br /> Bid Package Description Amount <br /> 2d Antenna Tower including footings and any required enclosure of the tower. $ 1065500 <br /> 8a Overhead coiling fire shutter at lobby $29500 <br /> 10d Signage including any building identification signage and monument sign . $ 11 ,250 <br /> Page 2 <br />