Laserfiche WebLink
Indian River County Turner <br /> • Emergency Operations Center <br /> GMP Summary <br /> Qualifications & Assumptions <br /> Bid Package 16 Electrical <br /> Specifications : <br /> 1 16011 . 3 . 4. F. 4 GMP does not include concrete encasement of raceways . Detail 5/E -8 <br /> does not indicate concrete encasement . <br /> 2 16102 . 2 . 1 & 2 .2 GMP is based on Leviton being an acceptable manufacturer for switches <br /> and receptacles . <br /> 3 161105 2 .3 . A GMP is based on using E . M . T. steel set screw fittings . Compression type <br /> as indicated in 16110 3 . 2C are excluded . <br /> 4 16110 . 3 . 1 . B GMP is based on the use of PVC (Sch 40 ) below slab on grade , rigid conduit <br /> is included in the floor slab . <br /> 5 16110 . 3 . 1 . B . d Conduits 2 1 /2" and larger shall be installed per the NEC . The <br /> requirement for any conduit 2 1 /2" and larger to be galvanized is excluded from the GMP . <br /> 6 16110 . 3 . 2. 0 GMP is based on conduit supports shall being per the NEC . The <br /> attachment of conduit is not limited to the methods described in the specifications . <br /> 7 16425 . 1 . 7. A GMP is based on Siemens being an acceptable manufacturer for the switch <br /> gear. <br /> 8 16481 . 2 . 5 . A GMP is based on Siemens being an acceptable manufacturer for all Motor <br /> Controllers . <br /> 9 16481 . 3. 5 , . A GMP is based on the testing being performed by the electrical <br /> subcontractor. The requirements of a certified testing organization is excluded . <br /> 10 16650 , 2 . 5 , E , 7 : GMP is based on the fuel tank capacity being sufficient for 72 hrs not 96 <br /> hrs . The 72 hour requirement is indicated on E-5 . <br /> Drawings : <br /> 1 E- 1 : Light fixtures are included per the electrical drawings and not the reflected ceiling <br /> plans . <br /> 2 Fuel for testing of the Emergency Generator is included . The final filling of the tank is <br /> excluded from the GMP . <br /> Page 8 <br />