My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-194
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 3:34:19 PM
Creation date
9/30/2015 9:45:42 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
06/06/2006
Control Number
2006-194
Agenda Item Number
11.C.1.
Entity Name
Turner Construction Co.
Subject
Amendment #4-Emergency Operations Center
Supplemental fields
SmeadsoftID
5668
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Turner <br /> • Emergency Operations Center <br /> GMP Summary <br /> Qualifications & Assumptions <br /> Bid Package 16 Electrical <br /> Specifications : <br /> 1 16011 . 3 . 4. F. 4 GMP does not include concrete encasement of raceways . Detail 5/E -8 <br /> does not indicate concrete encasement . <br /> 2 16102 . 2 . 1 & 2 .2 GMP is based on Leviton being an acceptable manufacturer for switches <br /> and receptacles . <br /> 3 161105 2 .3 . A GMP is based on using E . M . T. steel set screw fittings . Compression type <br /> as indicated in 16110 3 . 2C are excluded . <br /> 4 16110 . 3 . 1 . B GMP is based on the use of PVC (Sch 40 ) below slab on grade , rigid conduit <br /> is included in the floor slab . <br /> 5 16110 . 3 . 1 . B . d Conduits 2 1 /2" and larger shall be installed per the NEC . The <br /> requirement for any conduit 2 1 /2" and larger to be galvanized is excluded from the GMP . <br /> 6 16110 . 3 . 2. 0 GMP is based on conduit supports shall being per the NEC . The <br /> attachment of conduit is not limited to the methods described in the specifications . <br /> 7 16425 . 1 . 7. A GMP is based on Siemens being an acceptable manufacturer for the switch <br /> gear. <br /> 8 16481 . 2 . 5 . A GMP is based on Siemens being an acceptable manufacturer for all Motor <br /> Controllers . <br /> 9 16481 . 3. 5 , . A GMP is based on the testing being performed by the electrical <br /> subcontractor. The requirements of a certified testing organization is excluded . <br /> 10 16650 , 2 . 5 , E , 7 : GMP is based on the fuel tank capacity being sufficient for 72 hrs not 96 <br /> hrs . The 72 hour requirement is indicated on E-5 . <br /> Drawings : <br /> 1 E- 1 : Light fixtures are included per the electrical drawings and not the reflected ceiling <br /> plans . <br /> 2 Fuel for testing of the Emergency Generator is included . The final filling of the tank is <br /> excluded from the GMP . <br /> Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.