My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-194
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 3:34:19 PM
Creation date
9/30/2015 9:45:42 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
06/06/2006
Control Number
2006-194
Agenda Item Number
11.C.1.
Entity Name
Turner Construction Co.
Subject
Amendment #4-Emergency Operations Center
Supplemental fields
SmeadsoftID
5668
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"'" Indian River County y Turner <br /> Emergency Operations Center <br /> GMP Summary <br /> Report Date: 26 May 06 <br /> # Description GMP Total <br /> la General Requirements $38 , 820 <br /> Sitework $628 , 388 <br /> 2a Fences & Gates $585527 <br /> 2b Site Concrete with concrete <br /> 2c Landscaping $ 187, 182 <br /> 2d Antenna Tower allowance $ 106,500 <br /> 3 Concrete $6297065 <br /> 5 Structural Steel & Miscellaneous Metals $ 142 ,485 <br /> 6 Cabinets & Countertops $23,255 <br /> 7 Roofing $ 161 ,469 <br /> 7a Caulking & Sealants $21 , 190 <br /> 8 Doors, Frames, & Hardware $ 85 ,655 <br /> 8a Glass & Glazing $37, 520 <br /> 9 Drywall $308 ,511 <br /> 9b Tile $255986 <br /> 9b Acoustical Ceiling $21 , 190 <br /> 9c VCT & Carpet $385991 <br /> 9d Painting $34,900 <br /> 10 Miscellaneous Specialties $8 , 169 <br /> 10a Toilet & Bath Accessories $7 , 317 <br /> 10b Louvers $ 1 ,442 <br /> 10c Flagpole $27244 <br /> 10d Signage allowance $ 117250 <br /> 10e Fire Extinguishers & Cabinets $37160 <br /> IOf Access Flooring $297036 <br /> 12 Window Treatments $854 <br /> 15 Plumbing and HVAC $4509069 <br /> 15c Fire Protection $ 15 ,375 <br /> 16 Electrical $596, 615 <br /> Construction Contingency 5 % $ 183,758 <br /> Owner's Contingency $0 <br /> - Sales Tax Savings $0 <br /> Subguard $50, 166 <br /> Total direct work $3,909,090 <br /> General Liability Insurance $57 ,500 <br /> P&P Bond $51 ,938 <br /> Builder's Risk Insurance $247614 <br /> General Conditions $694,677 <br /> Fee $236, 891 <br /> Total Construction Cost $4,974,710 <br />
The URL can be used to link to this page
Your browser does not support the video tag.