My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-292
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-292
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2016 10:46:26 AM
Creation date
9/30/2015 11:06:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
09/04/2007
Control Number
2007-292
Agenda Item Number
11.J.4
Entity Name
Camp Dresser & McKee
Subject
Amendment No.4 to Work Order No.1 Services
Area
North County Water Treatment Plant
Supplemental fields
SmeadsoftID
6536
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
piping and the electrical feed duct bank during the construction phase of the project. <br /> Subtask 6.2 New Water Meter Modifications <br /> IRC has requested replacement of the bulk finish water meter that measures the amount of <br /> water sent to the distribution system. This meter has been in service since the ground storage <br /> tank and re-pump station was constructed over fifteen years ago. IRC staff indicated that the <br /> accuracy of the water meter has become questionable. There are many factors that affect the <br /> accuracy of a meter; therefore this effort will provide analysis of the meter layout, <br /> recommendations for resolution, specifications for modifications to the meter piping, and <br /> negotiations with the contractor for a change order to install a new meter. <br /> Subtask 6.3 Surge Valve Relocation <br /> The surge valve was relocated eliminating yard piping resulting in a cost savings to IRC of <br /> $17, 448 in Change Order 2 to the construction contract. This task is for the additional <br /> engineering services to review, evaluate, and document this change to the large yard piping for <br /> the plant. <br /> Subtask 6.4 Secondary Chlorine Injection Point Relocation <br /> The new secondary jinection point for backup chlorination of the finish water was relocated to <br /> achieve a savings in the double wall containment piping. This task also eliminates the need to <br /> replace the existing injection feed piping with double contained piping to conform to new EPA <br /> rules. CDM will work closely with IRC staff with a goal of construction cost savings for the <br /> project. CDM will review and evaluate the contractor's change order for this work and <br /> document the change on the plant piping plans. <br /> OTHER SERVICES NOT INCLUDED IN THIS SCOPE OF SERVICES (No Changes) <br /> The following list of items is not included in this Scope of Services but will be addressed in <br /> separate proposals or will be negotiated separately with IRC, if required: <br /> A. Excavation for field verification of the actual locations of existing underground utilities <br /> and structures. If field verification is necessary, excavation shall be provided by IRC as <br /> directed by CDM. <br /> B. Services associated with assisting IRC in the review and evaluation of patent-related <br /> disputes, issues, or claims including preparing to serve or serving as a consultant or <br /> witness for IRC in litigation, arbitration, public or private hearings, or other legal or <br /> administrative proceedings involving patent-related disputes, issues, or claims . <br /> C. SJRWMD Consumptive Use and FDEP Well Construction permitting and well system <br /> and raw water piping outside of the plant fence/ offsite design, bidding, and <br /> construction are to be conducted by others. <br /> D. Concentrate disposal relocation permitting is currently nearing completion by others . If <br /> necessary, services for concentrate disposal permitting will require a contract <br /> amendment. <br /> A-4 jb1414.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.