piping and the electrical feed duct bank during the construction phase of the project. <br /> Subtask 6.2 New Water Meter Modifications <br /> IRC has requested replacement of the bulk finish water meter that measures the amount of <br /> water sent to the distribution system. This meter has been in service since the ground storage <br /> tank and re-pump station was constructed over fifteen years ago. IRC staff indicated that the <br /> accuracy of the water meter has become questionable. There are many factors that affect the <br /> accuracy of a meter; therefore this effort will provide analysis of the meter layout, <br /> recommendations for resolution, specifications for modifications to the meter piping, and <br /> negotiations with the contractor for a change order to install a new meter. <br /> Subtask 6.3 Surge Valve Relocation <br /> The surge valve was relocated eliminating yard piping resulting in a cost savings to IRC of <br /> $17, 448 in Change Order 2 to the construction contract. This task is for the additional <br /> engineering services to review, evaluate, and document this change to the large yard piping for <br /> the plant. <br /> Subtask 6.4 Secondary Chlorine Injection Point Relocation <br /> The new secondary jinection point for backup chlorination of the finish water was relocated to <br /> achieve a savings in the double wall containment piping. This task also eliminates the need to <br /> replace the existing injection feed piping with double contained piping to conform to new EPA <br /> rules. CDM will work closely with IRC staff with a goal of construction cost savings for the <br /> project. CDM will review and evaluate the contractor's change order for this work and <br /> document the change on the plant piping plans. <br /> OTHER SERVICES NOT INCLUDED IN THIS SCOPE OF SERVICES (No Changes) <br /> The following list of items is not included in this Scope of Services but will be addressed in <br /> separate proposals or will be negotiated separately with IRC, if required: <br /> A. Excavation for field verification of the actual locations of existing underground utilities <br /> and structures. If field verification is necessary, excavation shall be provided by IRC as <br /> directed by CDM. <br /> B. Services associated with assisting IRC in the review and evaluation of patent-related <br /> disputes, issues, or claims including preparing to serve or serving as a consultant or <br /> witness for IRC in litigation, arbitration, public or private hearings, or other legal or <br /> administrative proceedings involving patent-related disputes, issues, or claims . <br /> C. SJRWMD Consumptive Use and FDEP Well Construction permitting and well system <br /> and raw water piping outside of the plant fence/ offsite design, bidding, and <br /> construction are to be conducted by others. <br /> D. Concentrate disposal relocation permitting is currently nearing completion by others . If <br /> necessary, services for concentrate disposal permitting will require a contract <br /> amendment. <br /> A-4 jb1414.doc <br />