Laserfiche WebLink
ATTACHMENT A <br /> PROJECT DESCRIPTION <br /> CDM will provide additional engineering services during the construction phase of the North <br /> County Water Treatment Plant. The increase in engineering services during construction <br /> reflects the additional effort to verify engineering, and incorporate additional items into the <br /> project. This amendment also addresses additional permitting effort required in the <br /> construction phase, namely modifications to the FDEP water plant permit and minor changes to <br /> the IRC site plan permit. <br /> SCOPE OF SERVICES <br /> Additional permitting and construction services required to expand the capacity of the North <br /> County Water Treatment Plant are provided in Part B of Attachment A. <br /> CONSULTING ENGINEER INSURANCE REQUIREMENTS <br /> A. Workers Compensation as required by the State of Florida. Employer's Liability of <br /> $100,000 each accident, $500,000 disease policy limit, and $100,000 disease each <br /> employee. <br /> B. General Liability: commercial general liability coverage, including contractual liability <br /> and independent contractor, with a minimum combined single limit of $100,000 per <br /> occurrence and personal injury coverage of $50,000. <br /> C. Business Automobile Liability: owned, hired, and non-owned vehicles at a minimum <br /> combined single limit of $100,000 per occurrence and personal injury coverage of <br /> $50,000 for bodily injury and property damage for owned and non-owned vehicles. <br /> D. Professional Liability Insurance: providing coverage for negligent acts, errors, or <br /> omissions committed by Consultant with a limit of $1,000,000 per claim/ annual <br /> aggregate. This insurance shall extend coverage to loss of interest, earning, profit, use, <br /> and business interruption, cost of replacement power, and other special, indirect, and <br /> consequential damages. <br /> COMPENSATION FOR SERVICES <br /> North County WTP - Phase Il Expansion Services <br /> Amendment No. 4 <br /> Task 1 - Updating of Preliminary Design N/ C Lump Sum <br /> Task 2 - Preparation of Contract Documents N/ C Lump Sum <br /> Task 3 - Permitting Services $22,700 Upper Limit <br /> Task 4 - Bidding Assistance N/ C Upper Limit <br /> Task 5 - Contract Administration/ Periodic Field Representation $3,500 Upper Limit <br /> Task 6 - Additional Engineering Services $20,600 <br /> Total 6 800 <br /> Compensation is to be paid on a billing rate basis plus other direct costs on an as-needed basis. <br /> CDM will submit monthly invoices for services performed. <br /> A-1 jb1414.do <br />