My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-292
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-292
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2016 10:46:26 AM
Creation date
9/30/2015 11:06:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
09/04/2007
Control Number
2007-292
Agenda Item Number
11.J.4
Entity Name
Camp Dresser & McKee
Subject
Amendment No.4 to Work Order No.1 Services
Area
North County Water Treatment Plant
Supplemental fields
SmeadsoftID
6536
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ FDEP required a permit to construct the plant process and site improvements. The <br /> original plant process permit had been on hold pending approval of the separate <br /> industrial discharge permit being prepared by others. CDM was directed to prepare <br /> and apply for a construction permit to allow for plant modifications for components that <br /> do not impact the required industrial discharge permit in an effort to expedite <br /> construction aspects. This permitting effort was not anticipated in the original scope of <br /> work. <br /> ■ FDEP will require a Construction and Operations permit to allow the new water <br /> production unit processes to be installed when the industrial discharge permit has been <br /> issued. This secondary submittal will be required prior to achieving the substantial <br /> completion milestones for the construction phase. <br /> ■ CDM will prepare a minor modification to the site plan permit issued by the IRC <br /> Planning and Zoning Department for a change to the entrance gate to reduce the <br /> number of gate operators and reduce the capital cost of the facility. No request for <br /> additional information is anticipated in this effort. <br /> Task 4. 0 Bidding Assistance Services (No Changes in this Amendment) <br /> Task 5.0 Contract Administration/PeriodicField Representation <br /> Membrane procurement for the project has required additional general services during <br /> construction to negotiate and retain the price quoted by the membrane manufacturer. IRC <br /> contracted directly with the membrane manufacturer, in lieu of through the Contractor, <br /> avoiding sales taxes resulting in a $44,432 savings to IRC. CDM assisted IRC in this membrane <br /> procurement effort which was Change Order Number One to the construction contract. <br /> Change Order Two to the construction contract has added 105 days to the substantial <br /> completion dates. The final completion date has not changed. CDM will work with IRC staff <br /> to minimize any extension in services during this construction period. CDM reserves the right <br /> to seek additional compensation for time that may be necessary to provide the oversight for <br /> certifying the construction complete and/ or time dependent engineering services associated <br /> with this extension. CDM will notify IRC Staff prior to potential scope or budge impact. <br /> Task 6.0 Additional Engineering Design Services <br /> This task is added to delineate additional engineering effort required to accommodate minor <br /> changes in the plant configuration by incorporating features, and changing or upgrading <br /> existing facilities. The following items are addressed under this task. <br /> Subtask 6.1 Large Yard Piping Modification: <br /> Raw water is pumped from the well field at the fairgrounds adjacent to the North County plant. <br /> Recent changes in the location of some new wells have required a change to the large yard <br /> piping plan for the plant. This task is for supplementary engineering services to accommodate <br /> these changes in the well field piping. Additional effort is included to negotiate the necessary <br /> change order to the construction contract for this modification. This effort affects both the yard <br /> A-3 jb1414.dx <br />
The URL can be used to link to this page
Your browser does not support the video tag.