My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-414
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-414
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2016 12:02:51 PM
Creation date
9/30/2015 9:29:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
12/13/2005
Control Number
2005-414
Agenda Item Number
11.J.4
Entity Name
Brown and Caldwell
Subject
Utilities Operations Complex Amendment No.4 to Work Order No.1
Area
Utility Operations Complex
Supplemental fields
SmeadsoftID
5324
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Michael Hotchkiss, P. E. <br /> Indian River County <br /> October 21 , 2005 <br /> Page 2 <br /> originally budgeted for BC construction phase services . As a result of this activity, and <br /> because of delays in project completion, we are projecting a budget shortfall. <br /> We have prepared an estimate of the additional labor hours and budget that BC will <br /> require to extend our existing Scope of Services through Summit Construction's current <br /> project completion date of April 28, 2005 . Our estimate is based on the following: <br /> 1 . Eight (8) hours of Bob Hrabovsky's time per month to attend the monthly on-site <br /> construction meetings and prepare meeting minutes for attendees. <br /> 2 . Four (4) hours of my time and four (4) hours of Bob 's time per month to address <br /> Contractor inquiries, coordinate the efforts of subconsultants, review Contractor pay <br /> requests, evaluate Contractor requests for Work Change Directives, and prepare <br /> Change Orders for approval by Indian River County. <br /> 3 . Eight (8) hours of Bob 's time and four (4) hours of my time to perform a site <br /> inspection documenting substantial construction completion and to prepare a punch <br /> list of items requiring attention by the Contractor. <br /> 4. Eight (8) hours of Bob 's time to perform a site inspection and document final <br /> construction completion. <br /> 5 . Four (4) hours of my time to prepare a letter certifying construction completion. <br /> 6 . Four (4) hours of administrative and clerical support per month. <br /> At our existing contract labor rates , the total cost of the labor hours identified above is <br /> $20,400. 00. If mileage for eight round trips to the site (six monthly meetings, two site <br /> inspections, 270 miles each round trip) at the contract reimbursable rate of $ 0 . 375 per <br /> mile is added, the total estimated cost is $21 ,210. 00. Recognizing that there is still <br /> $3 ,500. 00 remaining in BC 's existing budget, the additional budget required is <br /> $ 17,710. 00. <br /> In addition, while site work is going on, Carter Associates, Inc . (CAD is responsible for <br /> providing two (2) hours per day of resident inspection services. Because Sur tr, it's <br /> current schedule calls for site work to be performed over a 10-month period instead of <br /> the 6-month period that was used as the basis for the original budgeting, CAI estimates <br /> that they will require an additional 60 hours of inspector time and four (4) additional <br /> engineering site visits to maintain the originally intended level of construction oversight <br /> during the extended construction period. At CAI's contractual labor rates , the total <br /> additional budget required is $4, 920 . 00. <br /> 13: A125896\ IRC Utility Operations Cornplex \1 , 102105. doc <br />