My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-027
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 2:27:34 PM
Creation date
9/30/2015 10:32:55 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
01/23/2007
Control Number
2007-027
Agenda Item Number
11.I.1
Entity Name
Carter Associates, Inc.
Subject
Amendment No.5 Services Agreement Roadway Improvements
Area
66th Ave. from 4th St. to SR 60
Project Number
9810
Supplemental fields
SmeadsoftID
6090
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
% 1 <br /> INDIAN RIVER COUNTY, FLORIDA <br /> MEMORANDUM <br /> TO : Joseph A. Baird, County Administrator <br /> THROUGH: James W. Davis, P.E. , Public Works Direc <br /> FROM : Christopher J. Kafer, Jr. , P.E. , County Engine <br /> SUBJECT: Amendment No. 5 to the Professional Services Agreement with Carter <br /> Associates, Inc. for Roadway Improvements, 66th Avenue from 4th Street to <br /> SR 60 — IRC Project No. 9810 <br /> DATE: January 16, 2007 <br /> DESCRIPTION AND CONDITIONS <br /> Indian River County entered into a Professional Services Agreement with Carter Associates, Inc. on <br /> November 17, 1998 and approved Amendment No. 1 through Amendment No . 4 for additional <br /> service. <br /> Additional services are now required in order to accommodate the connection of College Lane at the <br /> alignment of 16th Street. The proposed bridge for College Lane over the I .R.F. W. C .D. Lateral A <br /> Canal will be required to be much higher than the existing bridge, which requires 66th Avenue to be <br /> much higher for proper tie-in. <br /> A summary of the proposed work for this Amendment is as follows : <br /> • Revise 16`h Street and 66th Avenue Plan & Profile sheets, Cross Sections, and Signing <br /> & Pavement Marking Plan sheets. <br /> • Revise drainage structures, drainage piping, and stormwater management report. <br /> • Revise Tabulation of Quantities and Summary of Drainage Structures. <br /> • Update engineer' s cost estimate . <br /> Breakdown summary of design costs for the project are as follows : <br /> Original Contract Price $ 66,000.00 <br /> Amendment No. 1 $ 95 ,000. 00 <br /> Amendment No. 2 $ 175820. 00 <br /> Amendment No . 3 $ 118 ,800 . 00 <br /> Amendment No. 4 $ 30,640.00 <br /> Proposed Amendment No . 5 $ 21 ,460. 00 <br /> NEW CONTRACT PRICE $ 349,720.00 <br /> FAEngineering\Capital Projects\9810-66th Ave, 4th St to SR 6019810 BCC Agn-Amend 5-01 - 16-07-cjk.doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.