Laserfiche WebLink
CARTER ASSOCIATES , INC <br /> CONSULTING ENGINEERS AND LAND SURVEYORS <br /> 1708 21st STREET <br /> VERO BEACH. FLORIDA 32960-3472 MARVIN E. CARTER, PS.NI_ <br /> 772-562 -4191 DEAN F LUETFUE. P. E. ,F i AN( , <br /> 772562 -7180 1KCX JOHN H. BLOM, P. E. <br /> FRANK S CUCCURESE, P. S.M. <br /> January 4, 2007 DAVID E. LUETRIE. P. S. M. <br /> G. SEAN MCGUIRE, BE, <br /> GEORGE SIMONS, RE. <br /> STEVE SNORERGER. PE. <br /> Mr. Christopher J. Kafer, Jr., P.E. , County Engineer PATRICK S. WALTHER, PE. <br /> Indian River County Engineering Division <br /> 1840 25 " Street <br /> Vero Beach, FL 32960 <br /> Re 66 " Avenue Roadway Improvements (4t° Street to State Road 60) <br /> Addendum No . 5 — Professional Services Agreement <br /> IRC Project No. 9810 (CAI Job # 98-23E) <br /> Dear Chris: <br /> We are pleased to present this proposed addendum for additional services relative to revising the construction <br /> plans to match the College Lane extension plans prepared by LBFH (dated November 22, 2006) . All <br /> Provisions of the original Professional Engineering Services Agreement (dated November 17, 1998) , <br /> including Addendum Nos. 1 , 2 , 3 and 4, shall remain in full force and effect, unless otherwise specifically <br /> modified herein . A man-hour breakdown is attached as Exhibit "A" for your use . The following describes <br /> our proposed scope of services and terms of agreement between Carter Associates, Inc . (CAI) and Indian <br /> River County (COUNTY) : <br /> Design Modifications : <br /> In general , the roadway plans and drainage design will be modified to accommodate the higher elevation on <br /> the eastern leg (College Lane) of the intersection due to the proposed bridge over the IRFWCD Lateral `A ' <br /> Canal, as follows : <br /> • Revise 16" Street and 66" Avenue Plan & Profile sheets, Cross Sections, and Signing & Pavement <br /> Marking Plan sheets. <br /> • Revise drainage structures, drainage piping, and stormwater management report. <br /> • Revise Tabulation of Quantities and Summary of Drainage Structures. <br /> • Update engineer 's cost estimate . <br /> Addendum No. 5 fees will be invoiced on a percent complete lump sum basis per our original engineering <br /> services agreement. The total amount to be billed under Addendum No. 5 shall not exceed $21 ,460 . 00 <br /> without further written authorization. <br /> Should you have any questions regarding our proposed scope of work or terms of agreement, please call me. <br /> Sincerely, <br /> CARTER ASSOCIATES , INC. <br /> le- - 4&I-r <br /> Patrick S . Walther, P .E . <br /> Project Manager <br /> Attachment- 1 a^ ♦� � SennPlonda <br /> Since 19u . <br /> 0:\PS WAP198-23 E\miscdoc\Addendum5.doc <br />