Laserfiche WebLink
CARTER ASSOCIATES, INC <br /> CONSULTING ENGWEERS AND LAND SURVEYORS <br /> 1708 21st SI REE"r <br /> NERD REAC11, FI,0RJDA 32960 J472 M.ARAaN f ('.;AR'I ER. I' S NJ <br /> 772 762 4 [ !) 1 DL IN 1 JA EIVE. <br /> 772-,-162 7180 1 P,1 x l <br /> 1011N If, BIaM. 1'. E <br /> IRCANK S_ CUCC I 'R FSL. Ps NI_ <br /> January 4, 2007 Davin E 1.ursrnaE. Ps.nL <br /> G. SEAN W GILt6, RF <br /> .E.UI2G1' SIAIONS, I - L_ <br /> Mr. Christopher J. Kafer, Jr. , P. E. , County Engineer SATRICKN�O1 Gut. er__ <br /> k'ATRICK S. \VgLTHPat. I2F. <br /> Indian River County Engineering Division <br /> 1840 25 ° Street <br /> Vero Beach, FL 32960 <br /> Re 66th Avenue Roadway Improvements (4th Street to State Road 60) <br /> Addendum No. 5 — Professional Services Agreement <br /> IRC Project No. 9810 (CAI Job # 98 -23E) <br /> Dear Chris : <br /> We are pleased to present this proposed addendum for additional services relative to revising the construction <br /> plans to match the College Lane extension plans prepared by LBFH (dated November 22 , 2006). All <br /> provisions of the original Professional Engineering Services Agreement (dated November 17 , 1998) , <br /> including Addendum Nos . 1 , 2, 3 and 4, shall remain in full force and effect, unless otherwise specifically <br /> modified herein . A man-hour breakdown is attached as Exhibit "A " for your use. 'Phe following describes <br /> our proposed scope of services and terms of agreement between Carter Associates, Inc. (CAI) and Indian <br /> River County (COUNTY) : <br /> _Design Modifications : <br /> In general , the roadway plans and drainage design will be modified to accommodate the higher elevation on <br /> the eastern leg (College Lane) of the intersection due to the proposed bridge over the IRFWCD Lateral ` A ' <br /> Canal, as follows : <br /> • Revise 10 Street and 66" Avenue Plan & Profile sheets, Cross Sections, and Signing & Pavement <br /> Marking Plan sheets . <br /> • Revise drainage structures, drainage piping, and stormwater management report. <br /> • Revise Tabulation of Quantities and Summary of Drainage Structures. <br /> • Update engineer ' s cost estimate. <br /> Addendum No . 5 fees will be invoiced on a percent complete lump sum basis per our original engineering <br /> services agreement. The total amount to be billed under Addendum No . 5 shall not exceed $21 ,460.00 <br /> without further written authorization. <br /> Should you have any questions regarding our proposed scope of work or terms of agreement, please call me . <br /> Sincerely, <br /> CARTER ASSOCIATES, INC. <br /> Id- - "Zvi <br /> Patrick S . Walther, P. E . <br /> Project Manager <br /> Attachment- 1 Se5 fl ig I Ionia <br /> CAI SinC[' ISN I <br /> 0-IPS WT198-23E1lnlscdoc Addendunl5-doc <br />