My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-325
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-325
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2016 1:42:11 PM
Creation date
9/30/2015 11:20:18 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT <br /> INDIAN RIVER UTILITIES DEPARTMENT <br /> NORTH COUNTY BRINE DISPOSAL <br /> PROJECT SCHEDULE <br /> An estimated schedule for completion for the scope of services contained in Amendment 5 is shown <br /> below. The time needed to complete each of the tasks described in Attachment 1 by Ecotech <br /> Consultants, Inc . and the County can be reasonably estimated as shown below with the limitation <br /> that neither the County nor Ecotech Consultants, Inc. can control the phase of the permitting process <br /> controlled by the Florida Department of Environmental Protection, the St. Johns River Water <br /> Management District, or the U. S . Army Corps of Engineers. <br /> Milestone Estimated Completion Date <br /> Sub-Consultant Services 30 September 2007 <br /> Services During Bidding 30 November 2007 <br /> Contract Administration and Construction Observation 30 September 2008 <br /> Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.